My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60919
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:39 PM
Creation date
11/20/2007 6:56:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999117
IBM Index Class Name
Permit File
Doc Date
5/24/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br /> <br />Task # : 011 Slate : Coloratlo PermiVlob# : M-1999-117 <br />Dale : OY792000 County : Saguache Abbreviation :none <br />User : RCO S,le : Coloratlo Gravel Products Pit Filename : M717-011 <br /> <br />Permit or other job action : New app/icalion - Onal reclamation <br /> <br />Task description : Spread topsoil on pi[ lloo! <br /> <br />HOURLY EQUIPMENT COST Basic machine :Cal DBN (1996) Horsepower : 285 <br /> Blade type : Semr-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per tlay <br /> Attachment no. 2 : 3-shank ripper <br /> <br /> Utilization % Cosl data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : E41. f0 NA <br /> Operating cost/hour : 855.64 100 <br /> Ripper op. cosUhour : 50.00 0 <br /> Operator cost hour : E23. 12 NA <br /> Total unit cosUhour : E719.86 Total fleet cosUhour : b119.88 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 8,584 LCY lector : NA volume: 6,584 LCY <br />Source of quan tity take-oH: Reclama8on plan <br /> <br />Source of est. swell lector : Na <br /> <br />HOURLY PRODUCTION <br /> Joh Condiuon Correction Factors <br />Average push distance : 150 feet Source <br /> Operator skill: 0.75 (avg.) <br /> Material consistency: 1.20 (Cal HB) <br />Unadjusted hourly production : 591 LCY/hr Dazing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description: Job efficiency: 0.83 (1shiNtlay) <br />Loose stockpile Spoil pile : 0.70 (/ndm0 <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (Iws) Altitude : 1.00 (Car HB) <br /> Material weight: 0.90 (Cal HB) <br />Average site altitude : 7,690 feet Blade type : 1.00 (S or UJ <br /> <br />Material weight : 2,550 Ihs/LCY Net correction : 0.47 <br />Material weight description <br />Earth-Dry packed Adjusted unit production: 278.56 LCY/hr <br /> <br /> Adjusted Oeet production : 278.56 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 30.82 Hours <br />Unit cost : E0.430 /LCY Total job cost : E3,694 <br />
The URL can be used to link to this page
Your browser does not support the video tag.