My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60919
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:39 PM
Creation date
11/20/2007 6:56:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999117
IBM Index Class Name
Permit File
Doc Date
5/24/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />TaskY : O07 Stale :Colorado PermtVjoh M . M-1999-117 <br />Dale : 05/7 92 0 00 County : Saguache Abbreviation :none <br />User: RCO Site: GOloratlo Gravel Protlucts Pif Filename:M117-007 <br /> <br />Permit or other job action : New application - Onal reclamation <br />Task description :Rip compacted areas: road, process area, pit /loot <br /> <br />HOURLY EQUIPMENT COST Basic machine: Cat DBN (1996) Horsepower: 285 <br /> Blade type :Semi-Unfversal <br /> Attachment no. 1 : ROPS Cab Shin basis : 1 per day <br /> ARachment no. 2 :3-shank ripper <br /> Utilization % Cost data source : (CRGJ <br />Cost Breakdown : Ownership cosUhour : E47, f0 NA <br /> Operating cosUhour : E55.64 700 <br /> Ripper op. cosVhour: 86.94 700 <br /> Operator cosUhour: 823.72 NA <br /> Total unit cosUhour : E726.80 Total Reel cosUhr : 8126.80 <br />MATERIAL gUANTITIES <br /> <br />Seismic <br />method: NA <br />Area <br />method : 25.00 <br />NA <br />Acres <br />Selected estimating method : Area <br />Load !actor: NA Bank volume: NA BCY <br />Rip depth (R): 1.50 volume : 6O,$OO BCY or CCV <br />Source of quantity take-olf : Re <br />Source of material load !actor : NA <br />HOURLY PRODUCTION <br />Seismic method <br />Area method. <br />Correction factors <br />Material seismic velocity : NA (eet per second <br />Unadjusted hourly production : NA BCY or CCV/hr <br />Average ripping depth per pass : 7.50 feel <br />Average ripping width per pass : 7.08 feel <br />Avorage ripping length par pass : 400.00 leaf <br />Average velocity of machine : 88.00 lest per minute <br />Average machine maneuvar time /pass : 0.25 minutes <br />Hourly production per unit area : 0.813 acres per hour <br />Unadjusted hourly production : 1,968.53 BCY or CCY/hr <br />Unadjusted hourly production : 1,968.53 BCY or CCY/hr <br />Sita altitude : 7,690 feet <br />Altitude adjustment : L00 (Cat HBJ <br />Job elRcienry factor: 0.83 (15hiNtlayJ <br />Net joh correction: O.B3 multiplier <br />Adjusted hourly unit production : 1,633.88 BCY or CCY/hr <br />Adjusted hourly gee! production : 1,633.88 BCY or CCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozers) <br />Unit cost : 50.078 /LCY <br />Total job time : 37.03 Hours <br />Total loh cost : $4,695 <br />
The URL can be used to link to this page
Your browser does not support the video tag.