Laserfiche WebLink
COIARADO DEPARTMENT OF HEALTA, Water quality Control Dlvisi.on <br />Rationale - Page 14. Permit No. CO-0032115. <br />VI. TER)Si AND CONDITIONS OF PERMIT <br />Table VI-5 - Monitoring Requirements - 001, 008, 010, 012, 013, 014 <br /> <br />Parameter Measurement <br />Frequency <br />Sample Type <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Total Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />011 and Grease, mg/1 Weekly Visual <br />pH, s.u. ~ Weekly Grab <br />Settleable Solids, ml/1 Monthly Grab <br />Total Dissolved Solids, mg/1 Quarterly Grab <br />Table VI-6 - Monitoring Requirements - 002, 003, 005, 006, 009, 011 <br /> <br />Parameter Measurement <br />Frequency <br />Sample Type <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Total Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />011 and Grease, mg/1 Weekly Visual <br />pH, s.u. Weekly Grab <br />Total Dissolved Solids, mg/1 Quarterly Grab <br />Whole Effluent Tonicity, Acute Quarterly Grab <br />2. Reporting: Trapper Mining must submit a Discharge Monitoring <br />Report (DMR) on a quarterly basis to the Division. This report <br />should contain the required summarization of the test results for <br />parameters shown in Tables VI-5 and VI-6 sad Part I.B.1 of the <br />permit. See the permit, Part I.B for details on such aub¢iiasion. <br />C. Additional Terots and Conditions <br />1. Materials Containment Plan: On January 16, 1987, the permittee <br />submitted as engineered spill plan. An update to the plan is' <br />required to be filed within 90 days of the permit effective cCate, <br />detailing all changes which have occurred since the original <br />submittal. For specific requirements, refer to Part I.E of r_he <br />permit. <br />