Laserfiche WebLink
~' <br />Blue Mountain Energy, Inc. - Deserado Mine <br />Quarterly Sediment Pond Inspection Report <br />Fourth Quarter 1999 <br />Inspector: Scott Wansted[ -Environmental Engineer <br />Operational Status <br /> Type of Appros Sediment OutFlow HZO Samp. <br /> Ponds Name Description Date H~0 Level % Level % Yes No Yes No Comments <br />I Sed Ponds DP-I D-Ponal 12/13 95 35 X X discharge and sampled earlier in quaver <br />2 RP-I Refuse Area I ~ 12/15 0 10 X X <br />3 RP-2/3 Refuse Area 2/3 12/15 5 3 X X <br />4 RP-4 Refuse Area4 <br />v 12/15 5 3 X X <br />5 RP-5 Refuse Area SA 12/16 10 10 X X <br />6 RR-I Railroad Fill Slope Pond I 12/15 0 5 X X <br />7 RR-2 Railroad Fill Slope Pond 2 12/15 0 5 X X <br />8 RR-3 Railroad Loop Pond ~ I?/IS 0 10 X X <br />9 SS-I Slot Storage Building Access Road Pond 12/15 0 10 X X <br />10 SS-2 Slot 9orage Biding Emerg. Coal Storage Arza Pond 12/1 S 0 5 X k <br />1 1 HSL-I Halandras Sanitary Land Fill Pond 12/1 S 0 5 X X <br />12 SDH-2U Down Hole Sump Upper Influent Pond inactive inactive 5 X X Shul oIT 2/96 due to mine sealing <br />13 SDH-2L Down Hole Sump Lower Ellluent Pond inactive inactive 5 X X Shut off 2/96 due io mine sealing <br />14 SDH-3/5 Down Hole Sump Discharge 2 inactive inactive 10 X X Shut off 2/96 due to mine sealing <br />IS EP-I East Purtal 12/13 0 5 X X <br />16 Sumps RRS-I Railroad Sump l 12/15 0 5 X X <br />17 TS-I Transfer Building I I?/IS 0 5 X X <br />18 TS-2 Transfer Building 2 12/15 0 5 X X <br />19 TS-2a Temp Coal Storage by Transfer 2 12/1 S 0 5 X X <br />20 EP-2 East Laydown Pad 12/13 0 5 X X <br />21 EP-3 West Lavdo++'n Pad 12/13 0 5 X X <br />22 EP-4 Turnaround Pad 12/13 0 5 X X <br />23 Proc Pond PP-I Prep Plant Process Pond 12/15 25 45 X X <br />24 PP-2 Prep Plant Process Pond 12/ I S 20 35 X X <br />25 RW-1 Raw Water Lagoon (g White River 12/13 100 X X Freshwater storage pumped from river <br />