My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26589
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:03 PM
Creation date
11/20/2007 6:52:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Hydrology
Doc Date
10/14/2004
Doc Name
BLM Sundry Notices for Plugging and Abandonment and EPA Plugging Record for Injection Wells
From
Natural Soda Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,.. <br />3A-4H WELL <br />PLUG AND ABANDOMENT <br />8/23/2004 <br />Rig up work over rig on well. <br />8/24/2004 <br />Run in well with 4-3/4 inch bit to 2009 feet. Tag 5-inch casing. Pull out of well. Run in <br />well with 4-1/8 inch bit to 2119 feet. Puli out of well. Swedge between 2-7/8 collar and <br />bit sub broke offpulling out of well. Left 4-1/8 inch bit and bit sub in well. Run in well <br />with 5 inch casing cutter to 400 feet. Tagged solid. Pull back out of well. Run 4-3/4 inch <br />bit through bad spot @ 400 feet several times. Did not hit anything. Pull bit back out of <br />well. Run 5 inch casing cutter back into well. Hit something @ 400 feet, but dropped <br />through and ran to 2088 feet. Made two cuts in 5-inch casing and pulled cutter back out <br />of well. Laid one bad joint of tubing down. Shut well in for night. <br />8/25/2004 <br />Rig up T&N casing crew. Cut off well head. Pu115-1/2 inch casing from well. Casing <br />parted @ 363 feet. Laid down 9 joints of 5-1/2 inch casing. Run in well with spear <br />assembly and sting into casing. Could not pull casing. Release and pull speaz from well. <br />Run in well with casing cutter to 2028 feet MD (1900 feet TVD) and re-cut casing. Pull <br />out of well with casing cutter. Run in well with speaz and pull casing out of well. Laid <br />down a115-1/2 inch casing (2009 feet) and 20 feet of 5-inch casing. Shut down well for <br />evening. <br />8/26/2004 <br />Run in well with 6-1/8 inch bit and scraper. Tag 5-inch casing @ 2028 feet. Pull out of <br />well. Run in well with 7-inch cast iron bridge plug and set @ 2020 feet. <br />Pull tubing from well. Attempt to fill well with water. Fluid staying about 100 feet from <br />surface at water truck rates. Ran tubing open ended to cement well. Shut down for the <br />day. <br />8/27/2004 <br />Rig up Big 4 cement trucks on well. Pumped first stage of 200 feet of 15.8# cement with <br />lost circulation material and 3% Calcium Chloride added into cement. Pulled 10 joints of <br />tubing. Waited 3 hours on cement to hazden. Run back into well and tagged cement @ <br />1800 feet. Pump second stage of cement into well. Got returns in 8 barrels of water <br />pumped. Pumped cement to surface. Pull tubing out of well, laying down on trailer. <br />Rig down. <br />9/24/2004 <br />Grout well to surface. Install dry hole marker. <br />
The URL can be used to link to this page
Your browser does not support the video tag.