Laserfiche WebLink
<br />2. Well Location Plan <br />The operator shall submit a well location plan that meets or exceeds the quality shown in Figure 1 <br />as part of the application for a well licence. The plan shall be a scaled drawing showing: <br />(a) the exact surface coordinates of the well taken from two intersecting township lot boundaries <br />where the North-South coordinates are to be determined first, and then the East-West <br />coordinates taken perpendicular to the direction of the North-South measurement; <br />the angle between the directions used to determine North-South and East-West coordinates <br />(b) <br />(c) <br />(d) <br />(e) <br />subsection (a); <br />the ground elevation of the well site above mean sea level; <br />a clearly drawn North arrow; <br />the well name and location (onshore: geographic township, <br />lake, block and tract); <br />tract, lot and concession; offshore <br />(f) all dwellings, commercial or industrial buildings, schools, churches, places of public <br />assembly, high voltage power lines, road allowances, transmission pipelines or other occupie <br />utility right of ways, rivers, streams or shorelines, including labeling, that are located within 10 <br />metres of the well site; <br />(g) the spacing unit prescribed by section 10 or 14, Regulation 915 or a subsequent Spacing <br />Order with its target area and its location within the township lot; <br />(h) the geographic coordinates (latitude and longitude) of the surface location of the well; and <br />(i) the name of the person who prepared the plan and the date the plan was prepared. <br />2.1. Units, Reporting and Datum <br />The measurements used to prepare the well location plan shall: <br />(a) be presented in the International System of Units (SI units), <br />(b) use geographic coordinates (north latitude and west longitude) based on the North American <br />Datum 27 (NAD 27) measured and reported to the nearest 100' of a second <br />(c) be accurate to the nearest 10`h of a metre for linear measurements; <br />(d) be accurate to the nearest minute for angular measurements; <br />(e) be surveyed from a vertical benchmark referenced to Geodetic Surveys of Canada based on <br />NAD 27 for ground elevation measurements and be accurate to the nearest 10~' of a metre; <br />and <br />(f) where the well is located in a water covered area, the location shall be verified with the drilling <br />rig on location. <br />2.2. Deviated and Horizontal Well Location Plans <br />Operators proposing a horizontal or deviated well shall submit: <br />(a) added to the plan view as required by Part 2, the proposed well bore trace and bottom hole <br />location of the well; <br />(b) across sectional plan showing the; <br />(i) target geological formation as anticipated by the geological prognosis, <br />(ii) direction of the deviated or horizontal well bore, <br />(iii) kick-off point of the well bore, and <br />(iv) the point(s) of intersection between the well bore and spacing unit target area(s). <br />r <br />