My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60840
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:36 PM
Creation date
11/20/2007 6:52:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Permit File
Doc Date
6/18/1999
Doc Name
OBJECTORS EXHIBITS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />(d) not recover conductor casing prior to cementing in the next casing string <br />3.11. Drilling Surface Hole, Casing and Cementing <br />Surface casing and cement shall; <br />(a) permanently isolate and protect all sources of potable water from other formations which <br />contain non-potable fluids; <br />(b) prevent cross-flow between different fresh water aquifers or any fluid bearing zone; <br />(c) prevent the sloughing of unconsolidated material into the well bore; and <br />(d) be capable of anchoring the well control equipment. <br />3.11.1. Surface Casing Set on a Shoe in Cable Tool Drilled Wells <br />It is a recommended practice that surface casing should be cemented to surface. The surface <br />casing may be set on a casing shoe if: <br />(a) there are no shows of water, hydrocarbons or brines in the open hole below the conductor <br />casing; <br />(b) the conductor casing is not leaking; <br />(c) flows of hydrocarbon or artesian water are not expected in the next segment of the well; or <br />(d) one set of casing is cemented across all fresh water zones. <br />3.11.2. Surface Drilling, Casing -Rotary <br />The surface hole shall be drilled sufficiently deep into bedrock to: <br />(a) secure cemented casing to bedrock; <br />(b) be 15 metres into non-porous competent bedrock and 15 metres below the lowest potable <br />water zone if that water is encountered in bedrock; or <br />(c) below all potable water zones yet above non-potable water zones if 15 metres is not <br />available between the potable and non-potable water zones. <br />3.11.3. Artesian Water <br />If artesian fresh water flow is expected in a well, a string of casing shall be run above the artesian <br />fresh water zone so that the flow of water can be controlled. A second string shall be run and set <br />below the artesian fresh water zone in order to isolate it from underlying porous formations <br />containing non-potable fluids. <br />3.11.4. Surface Casing Cementing <br />Surface casing shall be cemented before formations containing non-potable fluids are drilled except <br />where the requirements of section 3.11.1 are met for cable tool operations. Where surface casing <br />is cemented it shall be: <br />(a) cemented full length from total depth to surface; <br />(b) using cement volumes based on caliper volume if available or theoretical annular hole <br />volume plus the volume of the shoe joint plus; <br />(i) 50% excess cement if cement volume is based on theoretical calculation, or <br />(ii) 20% excess up to the designed cement top if cement volume is based on a caliper <br />volume; and <br />(c) cemented using the circulation method. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.