My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26584
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:03 PM
Creation date
11/20/2007 6:52:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Hydrology
Doc Date
12/11/1995
Doc Name
4TH QUARTER 1995 Inspections
From
NEW HORIZON MINE
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />WATER, SEDIMENT, OR SLURRY IMPOUNDMENT6 <br />Inspectors Name: i5oss G.,6~.-_ <br />NPDES ID. Na.: CO-0000213 004 <br />Facility Configuration: Sidehill Pond <br />Site Name: Impoundment R 004 <br />Mine Name: New Horizon Mine Western Fuels-Co <br />Mine ID No.:CMLRD Permit k0008-81 <br />Uwners Rep.: R, L. Wade, Nine Manager <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />IS <br />16 <br />17 <br />IB <br />19 <br />20 <br />Date: 1Z -~_ri5 <br />Date Last Inspected: q- S- 5S <br />Location: 47N15W31BC <br />Location:2 mi. NW of Nucla, Co. <br />CIRCLE OR WRITE IN APPROPRIATE RE8PONSE <br />Foundation Preparation (removal of vegetation, stumps, topsail) <br />Lift thickness finches): iZ ,.~-~.. <br />Compaction according to approved plan: <br />Burning (specify extent and location): <br />Angle of slope: 3:1 upstream, 3:1 downstream, <br />Seepage (specify location, color, and approx. volume) <br />From underdrain pipes: _ <br />Rt isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas:__ <br />From downstream foundat;on <br />"Boils" beneath stream or <br />Cracks or scarps on crest: <br />Cracks or scarps on slope: <br />Sloughing or bulging on slope:_ <br />+Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />+Eros:an of toe: <br />+Water impounded against toe: <br />Existing embankment freeboard (feet): <br />increase or decrease in water <br />Cracks, bulging, or erosion nn upstream face:_ <br />Visible sumps or sinkholes in slurry surface:_ <br />+Clogging <br />Spillway channels and pipes; <br />Decant system: <br />Diversion ditches: <br />+Cracking or crushing of <br />Spillway pipes:_ <br />Decant system: _ <br />Trash racks clear and <br />+Major ~s:' <br />to th "~ ~~ <br />not /~ hese <br />P ~ ~ o2PbE)J <br />'n •_ <br />in place: <br />s to these items <br />and Mine Manager <br />j hould normally <br />n a~u'~r an form. <br />~ZG_ ~s <br />- Yes• No N/A <br />Yes No N/A <br />:,yeses No N/A <br />Yes ~Na N/A <br />Tot a] = 6:1 <br />Yes No ..J~/q~~ <br />Yes Na N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/R <br />Yes •'No N/A <br />Yes 'No. N/A <br />Yes 'No N/A <br />Yes No. N/A <br />Yes Nb. N/A <br />Yes No. N/R <br />Yes No N/A <br />~ ? Feet <br /> Feet <br />Yes No. N/A <br />Yes "No N/A <br />Yes 'No N/A <br />Yes 'No~ N/A <br />Yes Na.. N/A <br />area: <br />ponded water: <br />pipes <br />Yes No. N/A <br />Yes No N/A <br />Yes1 No N/A <br />could cause instability and should be reported <br />for further evaluation. Adverse conditions <br />6e described (extent, location, volume, etc.) <br />level (feet): <br />
The URL can be used to link to this page
Your browser does not support the video tag.