Laserfiche WebLink
<br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name:_ CA/~Ry ,G1. .~e,rc~i~ Date: /-/8.90 <br />Pond Number: /0 Date Last Inspection: /O -ig-P9 <br />Site Name: C/ID,o ~ 2 Quarter: Fi~1l/ /99p <br />1. Design Depth Measured From Spillway Invert 9.0 <br />7. Design Maximum Sediment Level Measured From Spillway Invert 3,~3 <br />3. Sedimen± Level/Pond Bottom Measured From Spillway Invert 8.0 <br />4. Water Level Measured From Spillway Invert ,doNr <br />5. Discharge Through Spillway Since Last Inspection Yes k No <br />G. Rills and Gullies Yes ~_ No <br />7. Vegetation Adequate X Yes _ No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows _ Yes _~ No <br />10. Cracks r Yes ~ No <br />11. Seepage Yes ?~ No <br />12. Spillway Clogged _ Yes k No <br />13. Valves Operational ~ Yes _ No <br />ADDITIONAL COMMENTS:_yn ,P <br />MAIIdTENANCE REQUIRED: ~~L <br />4 F <br />~~ Q <br />2 ~ f; <br /> spILLWAf XNV! <br />- ~--- -- <br />~ ~ ry ~ z <br />h 1 h <br /> O <br />~ o w <br />~ O h ~ A `~"'~ <br />r~- -- <br />