My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60761
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:33 PM
Creation date
11/20/2007 6:50:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984094
IBM Index Class Name
Permit File
Doc Date
5/25/1984
Doc Name
LIMITED IMPACT 110 AND SPECIAL TEN DAY PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EXHIBIT B - Mining Plan <br />The proposed Gloria Z Mine will be located on private land approxi- <br />mately one mile west of Fairplay, Colorado. The area surrounding <br />the property has been mined in the past, and several test pits are <br />visible on the ground. <br />Mine Plan <br />Access to the property from Fairplay is on Colorado Highway 9 to <br />County Road 14. Roads to the property are maintained by Park County. <br />The placer deposit is located in glacial till, which can be easily <br />mined by an open-pit method. Samples taken at the site indicate <br />that the gold values will be fairly homogenous throughout the depth <br />of the formation. <br />A front-errl loader will be used to strip the topsoil from the areas <br />• to be affected and stockpile it for later reclamation. The front-end <br />loader will then excavate the sands and gravels and load them into a <br />dtunp truck for transporting to the processing facility. The mining <br />rate will be approximately fifty (50) tons pe'r day. <br />Equipment utilized in the mining operation will be: <br />•track~nounted front-enci loader (2 yard bucket) <br />dump truck (6 yard capacity) <br />one-ton truck (for maintenance) <br />•pickup trucks <br />•miscellaneous small equipment <br />In addition, 2 or 3 trailers will be parked on the site by workers. <br />Processing Plant <br />The processir~g plant is portable and will be transported to the site <br />on its own trailer. Moderate disturbance will result from the level- <br />ir~g of an area to set up the plant. One water storage impouncfrnent, <br />approximately 20' x 40' x 10', will be constructed. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.