Laserfiche WebLink
6.4.4 Exhibit D -Mining Plan <br />Earthwork <br />Earthwork will generally occur as indicated in Table 6.4.4-1. Sand and gravel <br />extraction will follow stripping of each mining cell. Reclamation will occur <br />concurrently wherever possible. For backfill earthwork volume, please see the <br />Reclamation Plan. <br />Table 6.4.4-1 -Mining Earthwork in Sequence <br /> VOLUME OF VOLUME OF <br /> STOCKPILE . <br />' <br />SITE LOCATION ACTIVITY MATERIAL STOCKPILE <br /> LOCATION REMOVED [yd3] [yd3] <br />Phase I -Cells 1, Install Perimeter Adjacent to trench 2,280 2,280 <br />2, and 3 Drain <br />Phase I -Cells 1, Construct Slurry Adjacent to trench 20,065 20,065 <br />2, and 3 Wall <br />Phase I -East Half Strip Topsoil and South boundary of Cell 3,800 3,800 <br />of Cell 1 Stockpile 1 <br />Phase I -East Half Strip Overburden West half of Cell 1 52,620 52,6202 <br />of Cell 1 and Stockpile <br />Phase I -West Strip Topsoil and South boundary of Cell 3,800 3,800 <br />Half of Cell 1 Stockpile 1 <br />Phase I -West Half Strip Overburden N/A 52,620 <br />of Cell 1 <br />Phase I -South Strip Topsoil and South boundary of Cell 12,000 8,500 <br />and East Area of Stockpile Portion 2 <br />Cell 2 <br />Phase I -South Strip Overburden N/A 228,180 <br />and East Area of <br />Cell 2 <br />Phase I -North Strip Topsoil and Northeast boundary of 12,000 2,000 <br />and West Area of Stockpile Portion Cell 2 <br />Cell 2 <br />Phase I -North Strip Overburden N/A 126,350 <br />and West Area of <br />Cell 2 <br />February 20, 2006 Bokelman/Walters Pit <br />Page 3 of 36 Regular 112 Permit Application <br />