Laserfiche WebLink
Central Appalachia Mining, LLC <br />Water Sampling Report <br />Date: 09-08-05 <br />Weather Conditions: Cloudy - 70 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs F1 <br />p EC <br />umhos/cm Tem C <br />p ( ) <br />SW-1 10:13 AM 0.4 8.3 2500 16.9 <br />SW-2 10:19 AM D - - - <br />SW-3 9:30 AM Dry - - - <br />SW-4 8:10 AM 1.1 8.2 3300 16.3 <br />SW-5 10:19 AM Dry - - - <br />SW-6 9:26 AM D - - - <br />SW-7 9:07 AM D - - - <br />SW-8 8:31 AM 0.4 8.4 2500 16.1 <br /> <br /> Ground Water <br />Sample <br />Point <br />Time SWL <br />feet <br />pH EC <br />umhos/cm <br />Temp (C) <br />GW-1 10:13 AM 9.5 7.3 4400 15.7 <br />GW-3 8:48 AM 37.7 7.1 3800 13.9 <br />GW-6 9:03 AM Dry-18.8' - - - <br />Third Quarter 2005 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />Location of PointslWells <br />SW-1 East Satt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />S W-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Satt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Satt Creek just below Munger Canyon - TD 47.3' <br />G W-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile construction. <br />