My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26537
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:01 PM
Creation date
11/20/2007 6:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Name
CERTIFICATION CDPS GENERAL PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF PUBLIC HEALTH & ENV/RONMEM -Water Quality Control Division <br />Rationale -Page 3 Permit No. COR-040000 <br />!V. STORMWATER DISCHARGES ASSOCIATED WITH MINING OPERATIONS <br />The stormwarer regulations require that stormwater discharges associated with certain industrial activities be covered <br />under the permit program. Mining operations are specifically included in the listed industrial activities. This general <br />permit is intended to cover stormwater discharges from most active and inactive metal mines. It is also intended to cover <br />stormwater discharges from mines (e.g., coal mines) which have individual CDPS permits for discharge of process <br />waters. <br />A. Tvoes of Sites Covered <br />This permit is intended to authorize most new and existing discharges composed entirely of stormwater from mining <br />operations that are within Standard Industrial Classification (S/C) Code 10 -Metal Mining and Milling, at sires <br />that discharge stormwater only. This category includes active and inactive mining and milling operations, and <br />remediation projects at such sites. <br />This permit is intended to cover those portions of a meta[ mining or milling sire that are not already subject to <br />effluent limitations under 40 CFR 440. Those previously urscontrolled areas which discharge stormwater that <br />comes in contact with overburden, raw material, intermediate products, byproducts, finished products or waste <br />products may be covered by this permit. Division policy number WQP-17 describes the difference between <br />srormwater and process water at a mine site. <br />This permit may also 6e used to cover existing discharges composed entirely of stormwater from any other metal or <br />coal mining operations that are currently covered by an indi4idua! CDPS permits for discharge of process water. <br />At the time of reissuarsce or amendment of the individual CDPS permit, terms and limitation from both permits may <br />be combined into a new individual permit. Table 1 presents the categories of the mining industry and their COPS <br />Stormwater permit coverage. <br />The Division intends ro continue its practice to cover only one area with each permit certification. As long as the <br />operations or inactive mines are comiguous, one permit certification is sufficient. However, if a mine-waste <br />remediation plan calls for removal of material and disposal at a location away from the mine-waste site, separate <br />permit coverage must be obtairsed for the disposal site. <br />B. Mine-Waste Remediation Proiects <br />This permit is intended to authorize most stormwater discharges from mine-waste remediation projects. There are <br />numerous inactive mirse sites located throughout the State that may undergo remediation operations to reduce <br />impacts to water quality, to relieve the obligation for permit coverage, or to return land to a different land use. <br />These types of sites and their stormwater discharges were not specifically addressed in the preceding version of this <br />permit. This permit has been revised to address the special considerations of these types of operations. This <br />permit now contains additional SWMP requirements for remediation projects. These are detailed at Part I.C of the <br />permit, and summarized at VI.B.2 below. The Division foresees three general cases where permittees will use thesc <br />provisions: <br />Inactive mirse sites where the permittee begins a remediation project in order to terminate coverage under an <br />existing. /n this case, the permittee will amend their SWMP to address the remediation concerns as outlined <br />in Part I.C.S of the permit, and proceed with remediation. Certification under this permit would be <br />terminated when the termination criteria and other conditions listed at Part I.F of the permit are met. <br />Inactive mine sites where no previous stormwater permit coverage exists, and the owner or a third parry (with <br />permission of the owner) plans to remediate the site. In this case, the SWMP would be prepared, including <br />the items in Pan I.C.S of the permit, and the owner or third parry would submit the completed permit <br />application. After the permit certification is issued, stormwater discharges from the remediation project <br />would be authorized. Certification under this permit would 6e terminated when the termination criteria and <br />other conditions listed at Part I.F of the permit are met. <br />
The URL can be used to link to this page
Your browser does not support the video tag.