Laserfiche WebLink
andall ~ As <br /> <br />PROCTOR TEST RESULTS <br />1 <br />0 <br />0 <br />~ 108 <br />m <br />U <br />W <br />a <br />a <br />z <br />0 100 <br />a <br />CLIENT Peabody Coal Company __PROJECT NO. 89-168 <br />PROJECT Seneca Pti ne 11a u1 Road _ DATE 5 <br />LOCATION llayden, Colorado <br />SOURCE OFSAM PLE STA. 114+50 SAMPLE NO. 4 EN G. TEGH <br />DESCRIPTION OF SAM PLE Clay, clayscone, dark grey <br />ASTMIARSWI'p ~ 698 METHOD A <br />115.11 <br />MOISTURE-PERCENT OF DRY WEIGHT <br />15 20 ZS 30 35 <br />MAX. DRY DENSITY ~$• 5 PCF <br />OPTIMUM M.C. 23.5 <br />1I0 <br />r <br />z <br />w <br />0 <br />s 95 <br />0 <br />90 <br />• <br />• <br />85 <br />3 <br />S.l i I <br />