Laserfiche WebLink
andall <br /> <br />PROCTOR TEST RESULTS <br />CLIENT Peabody Coal Company PROJECT NO. ~g-241 <br />PROJECT Haul Road A ~ DATE 9/16/£s9 <br />LOCATION Hayden, Colorado <br />SOURCE OF SAMPLE STA. 40+00 SAMPLE NO. 1 EN G.TECH FW <br />OESCRIyPyTIyOyNyyOFSAMPLE Sandstone, light brown to brown <br />ASTM/AASIYTO ~ 6g8 METHOD A <br />1 <br /> <br />O <br />' O <br />LL <br />O <br />m <br />v <br />w <br />• 6 <br />N <br />O <br />2 <br />O <br />4 . <br />F <br />N <br />z. <br />W <br />O <br />• } <br />D <br />MOISTURE-PERCENT OF DRY WEIO HT <br />1 5 10 15 20~ 25 <br />150 <br />MAX. DRY DENSITY leg' ~ PCF <br />15.0 <br />OPTIMUM M.C. % <br />1 ~0 <br />190 <br />120 <br />110 <br />100 <br />90 <br /> <br />• <br />