Laserfiche WebLink
• <br />Mileage: 1 Round <br />Trip <br />PROJECT: Seneca Pond 006 - Haul Road A DATE: 10/25/E39 <br />LOCATION: Routt County, Colorado TIME: 2.0 hours <br />CLIENT: Peabody Coal Co. BNGR./TECiINICIAN: MDS <br />WORK PERFORMED: <br />Seneca Mine had placed and compacted on site .c lay <br />fill on haul Road "A" from STA. 52+00 to STA. 70+00 offset 0 <br />to 20 feet right of centerline. <br />We conducted nuclear density tests at several locations <br />,~ along the Ilaul Road. <br />REMARKS: <br />In general, the tests conducted today met or exceeded • <br />tl~e specification compaction requirement despite the low <br />moisture content readings. Tests #17 and #1Q were retested <br />several times with similar results. Visually the material <br />appeared the same and the Campbell hammer drove into the soil <br />with similar degrees of difficulty. No pumping or other <br />movement was noted when fully loaded 637 Scrapers drove on <br />the road. ,. <br />Please refer to the attached Nuclear Density test <br />results for details on today's testing. <br />VERBAL DISCUSSIONS: <br />We spoke with Roy Karo and informed him of today's test <br />results. <br /> <br /> <br />REPORT NO.: 10 <br />PROJECT NO.: 89-241 <br />