My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60665
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:29 PM
Creation date
11/20/2007 6:48:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.02 General Requirements for Coal Exploration
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sc;vrn 2.02.2 <br />Exploration areas addressed by any notice of intent may be either within or ouuide the permitted <br />• area. Individual notices of intent will both describe and 1«ate on a map of appropriate scale the <br />specific exploration site(s). Individual notices of intent will also provide the following program <br />specific information: <br />• Initiation date and duration of planned exploration activities <br />• Right of entry d«umentation where applicable <br />• Maximum number of drillholes within each quarter-quarter section <br />• Drillhole diameter(s) and approximate depth(s) <br />• Type of drilling and suppon equipment to be utilized <br />• Statement of no significant impact for proposed exploration area(s) relative to threatened <br />or endangered species or critical habitat for such species <br />• Documentation of right of entry for any exploration sites outside of the permitted area <br />In addition to the specific information to be presented in each individual notice of intent, as noted <br />above, the following practices are universally applicable to all anticipated exploration activities and will <br />be referenced accordingly in the notice of intent. <br />Exploration Access <br />• To the extent possible, exploration sites will be 1«ated adjacent to existing roads or trails. If existing <br />access is not available and ground conditions are favorable, exploration equipment may move across <br />undisturbed tenairt to access the exploration site. In the case of access across undisturbed terrain, <br />equipment movement and other traffic will be kept to an absolute minunum If surface disturbance is <br />unavoidable in order to access an exploration site, any requured roads will be constructed at the <br />minirrnim practical width and will be aligned so as to m;nimi~r total length, avoid drainages, and limit <br />erosion to the extent possible. <br />Since any required exploration roads are expected to be in use less than 6 months, they will be <br />constructed in compliance with applicable standards for light-use roads tinder Rule 4.03.3. Where <br />constnrction of new roads or modification oI existing roads is required, road work will be initiated <br />immediately prior to exploration and road comdors will be reclaimed as soon as possible following <br />completion of exploration activities. <br />Construction of exploration roads, where required, will involve clearing trees and large shmbs from <br />the road alignment, removing and windrowing available topsoil on the side of the road, establishing <br />drainage along the road by constructing temporary ditches, berms, or installing temporary culverts as <br />required, and grading the road to provide a smooth operating surface. <br />Exploration Trenching <br />In order to plan forand'complete detailed designs for mine face-up and initial mine development, <br />OMI may do limited surface trenching to locate, delineate, and characterize coal seam outcrops. <br />Normally any required trenching will be done on or adjacent to existing roads and will involve the tsse <br />. of a tracked dozer or backhole to remove any overlying material and expose the coal seam Trenching <br />will be limited to a ~„av,mum depth of approxunately 30 feet, with trench width corresponding to <br />depth to assure safe conditions for inspection of the exposed coal seam If trenching or temporary <br />placement of the excavated material will impact any undisturbed areas, soil material will first be <br />removed and windrowed along the edge of the disturbance area. Once the coal seam is exposed, it <br />PR04 2.02-2 Revised August 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.