Laserfiche WebLink
<br /> <br />Runof( <br />OXBOW CARBON & MINERALS <br />POND D SUMMARY <br />Runof(Volume (10-year, 24-hour) <br />Active Pond Storage <br />Sediment <br />3 Year Sediment Yield <br />Pond Sediment Storage <br />Sediment Storage Elevation <br />Primary Spillway <br />Type <br />Invert Elevation <br />Emergency Spilhvay <br />Type <br />Invert Elevation <br />Peak Discharge <br />Peak Discharge In (10-year, 24-hour) <br />Peak Discharge Out (10-year, 24-hour) <br />Peak Elevation <br />Peak Settleable Conc. <br />Peak Discharge In (25-year, 24-hour) <br />Peak Discharge Out (25-year, 24-hour) <br />Peak Elevation <br />Top of Embankment <br />Freeboard <br />Inlet Channel <br />Peak Flow (Q) <br />Bot[om Width <br />Side Slopes H:V <br />Slope <br />RipRap D50 <br />1.62 ac-ft <br />0.54 ac-ft <br />0.48 ac-k <br />0.48 ac-ft <br />6,162.0 ft <br />12 inch cmp riser with 12 inch barrel <br />6,166.0 ft <br />12 inch cmp <br />6,168.1 ft <br />28.3 cfs <br />5.4 cfs <br />6,168.0 ft <br />0.43 ml/I <br />40.2 cfs <br />7.7 cfs <br />6,168.8 ft <br />6,170.0 k <br />1.2 ft <br />28.3 cfs <br />10.0 ft <br />3:1 <br />33 <br />12 in <br />• <br />