My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60664
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:29 PM
Creation date
11/20/2007 6:48:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
REVISED AND NEW POND DESIGNS
Section_Exhibit Name
Exhibit 2.05-E3 SECTION 6
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Ponds <br />The following is a list of the pond designs contained m this section: <br />Pond Al - Pond Al collects and treats all the drainage from the loadout area. The <br />pond location and watershed area ate shown on Map 2.05-Ivf4, Drainage and <br />Sediment Control Plan. The pond design is shown on Map 2.05-bfSF. The <br />pond incorporates an 18" riser principal spillway and is designed to treat the <br />10-years, 24-hour event. The principal spillway can also safely pass the peak <br />discharge from the 25-year, 24hour event while maintaining 1 foot of <br />freeboard. If the principal spillway should clog, the existing paved entrance <br />road will act as the emergency spillway with any overflow from the pond <br />crossing the entrance road and flowing to the same point where the principal <br />spillway discharges. <br />Pond B - This pond collects and treats all drainage from the main Elk Creek Surface <br />Facilities Area. The pond location and watershed azea are shown on Map <br />2.05-M4, Drainage and Sediment Control Plan. The pond design is shown <br />on Map 2.05-MSB. <br />Pond C - This pond collects and treats all drainage from the West Valley Fill <br />Development Waste Disposal Area. The pond location and watershed area <br />are shown on Map 2.05-M4, Drainage and Sediment Control Plan. The <br />pond design is shown on Map 2.05-MSC. <br />• <br />Pond D - This pond collects and treats all drainage from the EII: Creek Ivline Surface <br />Facilities Area, including the conveyor corridor as shown on the drawings. <br />The Principal spillway discharge pipe wdl have a gated valve. The valve will <br />remain open during all storm events. The pond location and watershed area <br />are shown on Map 2.05-M4, Drainage and Sediment Control Plan. The <br />pond design is shown on Map 2.05-MSG. <br />Substation - This pond collects and treats all drainage from the Substation No. 3 and C- <br />Pond No. 3 Gulch Ventilation Shaft areas. The pond location and watershed azea are <br />shown on Map 2.05-M4, Drainage and Sediment Control Plan. The pond <br />design is shown on Map 2.05-MSE. <br />All ponds were designed to contain or treat the mnoff resulting from the 10-year, 34hout event. For <br />all ponds the emergency spillway is designed to safely pass the peak dischazge resulting from the 25- <br />year, 2d-hour event. The ponds were designed according to the methodologies and assumptions <br />contained in Section 5. All hydrology inputs and results are shown on [he SEDCAD printouts <br />contained in Section 10. A summary of the results is shown on the following Tables. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.