Laserfiche WebLink
<br /> <br />® STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER ApR 1 3 2006 <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 816 ~ Ivi on {Minerals and Geolo9Y <br />Denver, Colorado sozo3 Response~o ~ec~amatton Permit Application Consideration <br />Phone (303) 866-3581 <br />FA7( (303) 866-3589 <br />wvnvwaterAstateco.us April 13, 2006 RECE~,/ED <br />TO: Steve S. Shuey, Environmental Protection Specialist ~PR j 3 ZUQ6 <br />CC: Division 4 Office; District 40 Water Commissioner <br />// ivision of Minerals and Geology <br />FROM Cynthia J Love Water Resource EngineerL~ <br />~4~ep~ <br />r~~ <br />Y 1878 ~ <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />> r/ <br />RE: Operator: Eldon & Cornelia Reynolds, Reynolds Pit, File No. M-2006-028 <br />Section 15, Twp I S S, Rng 96 W, 6th P.M., Delta County <br />Landowner- Eldon & Cornelia Reynolds <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations ofall wells within 600 feet mile ofthe permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br />® The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for:_uses at the permit site, storage in the excavated <br />area(s). The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />^ Other: <br />COMMENTS: No information was provided regarding water use or ground water exposure for this proposed <br />operation, thus we cannot comment on potential injury to existing water rights. <br />