My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60642
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:28 PM
Creation date
11/20/2007 6:47:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976027
IBM Index Class Name
Permit File
Doc Date
11/20/2000
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task X : 07a State :Colorado PermMob 8 : M-1978-027 <br />Data : 77802000 County : La Plafa Abbreviation :none <br />User : SSS Site : Craip Pit Filename : M027.O7a <br />Permit or other joh action : Technical Revision No. 2 <br />Task description :Replace Topsoil on Dlstur6ed Areas Except Reclaimed Processing/Slockpile <br />HOURLY EQUIPMENT COST <br />Model :Car 633E <br />Shift basis : 1 per day <br />Cost Breakdown : Job ulil¢ation % Horsepower 475 <br />Ownership cosUhour: E65. 79 NA <br />Operating cosUhour: $105.75 100 Weight (UST) : 56.00 <br />Operator cosphour : 523.30 NA Cosl data source : (CRGJ <br />Total unit cosUhour : 8794.25 Total Meet wsUhour : j194.25 <br />MATERIAL QUANTITIES <br />Initial Svrell Loose <br />volume: 72,423 LCY lador: NA volume: 12,427 LCY <br />Source of quantity take-o8: Assume 15 ac. Covemtl w/5 R. o/Topsoil <br />Source of estimated swell factor : NA <br />Hauling CaoaciN <br />Basis <br />Material description <br />Earth -Loam <br />Ralad payload: 82,000 pounds <br />Payload capacity: 39.05 LCY <br />Bawl (volume) Basis <br />Struck volume : NA LCY <br />Heaped volume: 34.00 LCY <br />Average volume : 34.00 LCY <br />Adjusted capacity : 34.00 LCY °' <br />Cvcle Time(load +haul«spread+retuml: Loading lime: 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : • Ioadin9 time per pair on push pull models <br />Route I Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 350 -7.7 5.0 -2.7 2,640 0.33 minutes" <br />Relum: 350 7.1 5.0 12.1 892 0.52 minutes" <br />•• [ravel lima atltusletl for acceleration antl tleceleraOOn at loatl antl tlump pcinh <br /> Talal cycle lime 2.44 minutes <br />Job Condition Corregion Factors <br />Sne ahilude (feet) : 6,720 Adiusled Houdv Production <br />Altitude adjustment factor : 0.96 (Car HBJ <br />Job eFicienq factor : 0.83 (1 shiR7dayJ Unadjusted unit production : 835.12 LCYMour"' <br /> Adjusted unit production : 665.43 LCYMour <br />Nel job correction factor : 0.80 Adjusted Beet production : 885.43 LCY/Hour <br /> ••• 2limes wlume on push pull models <br />JOB TIME AND COST <br />Fleet size : 7 Scraper(s) Total job time : 18.87 Hours <br />Unit cost : 80.292 /LCY Total job cost : SJ,828 <br />
The URL can be used to link to this page
Your browser does not support the video tag.