Laserfiche WebLink
<br />CIRCES Cost Estimating Sofhvare <br />SCRAPER -ONLY WORK <br /> <br />Agency or organization name : DMG <br />Task 0 ; 05a Slate :Colorado PermiUjob K : M-1976-027 <br />Dale : 11/10/1000 County : La Plata Abbreviation :none <br />User : SSS Site :Craig Pit Filename : M027-OSa <br />Permit or other job action :Technical ReNSbn No. 2 <br />Task description :Haul and Place West Overburden Slockplle Along West Benn <br />HOURLY EQUIPMENT COST <br /> Model : Cat 633E (7996) <br />Cost Breakdown : Job utilization 40 <br /> Ownership cosUhour: 865.79 NA <br /> Operating cosUhour : 8705.15 100 <br /> Operator cost/hour : 823.30 NA <br /> Total unit cosUhour : 8794.25 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 7,296 LCY (actor: NA volume: <br />Source of quantity take-ofl : TR-02 cost e+hlbit item no. 7 <br />Source of estimated swell !actor : NA <br />HOURLY PRODUCTION <br />Haul'ne CaoaciN <br />Material weight : 2,800 pounds/LCY Struck volume : NA LCY <br />Material description : Heaped volume : 34.00 LCY <br />Clay-Natural bed Average volume: 34.00 LCV <br />Rated payload: 82,000 pounds <br />Payload capacity : 29.29 LCY Adjusted capacity : 29.29 LCV ••• <br />Cvcle Time (load + haul + soread + return! : Loading lima : 0.90 minutes - <br /> Maneuver and spreading time : 0.70 minutes <br />Travel lima : • IoadlnB time per pair on push pull models <br />Route I Distance (lest) ~ Grade (%) I Roll. res.(%) I Total res.(Ya) I Velocity ((pm) ~ Travel time (min.) <br />Haul: 200 0.0 5.0 5.0 1,243 0.29 minutes-' <br />Return : 200 0.0 5.0 5.0 2.124 0.25 minutes -' <br />travel lime atlrys[ed for acceleration and deceleo0on a[ load and dump points <br />Job Condition Correction Factors <br />Site allllude (lest) : 6,720 <br />Altitude adjustment factor: 0.96 <br />Job efhcienq factor : O.B3 <br />Net job correction factor : O.BO <br />JOB TIME AND COST <br />Fleet size : 7 Scraper(s) <br />Shill basis : 1 per tlay <br />Horsepower : 475 <br />Weight (UST) : 56.00 <br />Cost data source : (CRG) <br />5194.25 <br />1,298 LCV <br />Total cycle lime : 2.13 minutes <br /> <br />Adiusted Houdy Production <br /> <br />Unadjusted unit producion : 823.95 LCY/Hour''' <br />Adjusted unit production : 656.52 LCY/Hour <br />Adjusted 9ee1 production : 658.52 LCY/Hour <br />2 times volume on push pull models <br />Total job lime : 1.97 Hours <br />Unit cost : 80.296 /LCV Total job cost : 83113 <br />