My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60633
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:27 PM
Creation date
11/20/2007 6:47:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
12/1/2005
Section_Exhibit Name
Appendix 9 Reclamation Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 21-Nov-2005 Permit orjob no. <br />User : TAK Abbreviation <br />Task' 000 Filename <br />Agency or organization name : CDMG <br />Permit orjob action : G81-035 <br />Trek Aosnrinfinn ' TR-9 <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Demolish and bury or haul structures demolish 1 125.0 $41, 791 <br />002 -Rip 12" in upper facility area dozer 1 3.7 $590 <br />003 -Push ripped waste to tipple highwall dozer 1 16.2 $2,405 <br />004 -Haul topsoil/growth medium to upper facilities area scraped 1 7.3 $1,085 <br />005 -Finish-grade upper facilities area grader 1 2.1 $163 <br />006 -Revegetate upper facilities area (area #3) revege 1 2.9 $1,069 <br />007 -Haul topsoiUgrowth medium to highwall scraped 1 5.2 $776 <br />008 -Doze fill into portals, rough-grade fill slope and topsoil dozer 1 1. $227 <br />009 Revegetate highwall area (area #4) revege 1 1.9 $714 <br />010 Rip and 6na1-grade lower/acilities area grader 1 1.3 $100 <br />011 -Revegetate lower facilities area (area #2) revege 1 1.7 $649 <br />012 -Regrede 3.5"thick fill on pre-law part o/refuse pile dozer 1 5.7 $856 <br />013 -Regrede 6" of growth medium on pre-law refuse area dozer 1 1.1 $171 <br />014 -Revegetate reclaimed refuse area (area #5, previously disturbed) revege 1 0.8 $316 <br />015 -Hau13.5 ff of fill to refuse pile dozer 1 34.9 $5,165 <br />016 -Rough-grade 3.5 R thick fill on current law area of refuse pile dozer 1 9.1 $1, 358 <br />017 -Haul stockpiled topsoil to refuse pile (current law area) scraped 1 4.9 $741 <br />018 -Finish-grade topsoil on refuse area grader 1 1.1 $88 <br />019 -Revegetate refuse area (area #6, not previously disturbed) revege 1 1.6 $589 <br />020 -Finish-grade topsoil borrow area grader 1 2.2 $166 <br />021 -Revegetate topsoil borrow area revege 1 3. $1,091 <br />022 -Seal vent hole borehole 1 4.0 $1,447 <br />023 -Backfill and regrede east and west sediment ponds dozer 1 10.4 $1, 525 <br />024 -Construct ditches A, B, C, D, E, and F (fabric in 8, riprep E & F) NA 1 17.0 $3,915 <br />025 -Revegetate east and west ponds (area #1, previously disturbed) revege 1 2.8 $1,014 <br />032 -RilUgully maintenace, 8 hours every other yr. over 10 years dozer 24 24.0 $1,358 <br />033 -RilUgully maintenance, 8 hours every other yr. over 10 years grader 1 23.7 $1,738 <br />035 -Mobilize/demobilize equipment for initial reclamation mobilize 1 8.6 $7,494 <br />036 -Mobilize/demobilize equipment for site maintenance mobilize 1 12.6 $10,859 <br />037 -Mobilize/demobilize equipment for pond removal mobilize 1 3.6 $536 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 341.33 $89,998 <br /> <br />C-81-035 <br />none <br />C035-000 <br />Site :King Coal Mine <br />State :Colorado <br />County :La Plata <br />
The URL can be used to link to this page
Your browser does not support the video tag.