My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60633
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:27 PM
Creation date
11/20/2007 6:47:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
12/1/2005
Section_Exhibit Name
Appendix 9 Reclamation Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'ask # Description Hours Direct Co< <br /> Structure demolition 116.4 $48,: <br /> # 3 UPPER FACILITIES AREA -PREVIOUSLY DISTURBED <br /> Rip Upper Facilities Area 15.8 $1,5 <br /> Push 12" coaly-waste to highwalls 11.6 $1,4 <br /> Haul topsoil/growth medium to Upper Facilities Area 9.6 $1,4 <br /> Finish grade 2.2 $1 <br /> Apportioned revegetation costs 1.96 acres ys <br /> # 4 HIGHWALL AREA- PREVIOUSLY DISTURBED <br /> Haul topsoil/growth medium to highwall 4.7 $6 <br /> Doze fill into portals, rough-grade fill slope and topsoil 1.9 $2 <br /> Apportioned revegetation costs 1.31 acres g~ <br /> # 2 LOWER FACILITIES AREA -PREVIOUSLY DISTURBED <br />OA & B Rip & final grade w/12H grader 2.5 $1 <br />1 * Apportioned revegetation costs 1.19 acres 35 <br /> # 5 RECLAIMED REFUSE AREA- PREVIOUSLY DISTURBED <br />2 Doze 3.5' fill (Completed) 4.3 $4 <br />3 Doze growth medium @ 6" (Completed) .6 $ <br />4* Apportioned revegetation costs 0.58 acres (Completed) $2 <br /> # 6 REFUSE AREA-CURRENT STANDARDS <br />5 Haul 3.5' fill to refuse pile 33.6 $4,9 <br />6 Rough grade fill 1 $ <br />7 Haul topsoil to refuse pile 8.4 $1,2 <br />8 Finish grade topsoil 1.2 $ <br />9* Apportioned revegetation costs 1.08 acres $5 <br /> TOPSOIL BORROW AREA <br />0 Finish grade = 2 acres disturbance 2.4 $1 <br />1 ` Apportioned revegetation costs 2.0 acres S9 <br /> SEAL VENTS <br />2 Seal vent hole (Completed) 4 $1,4 <br /> # 1 EAST & WEST POND AREA -PREVIOUSLY DISTURBED <br />3 Reclaim East and West ponds 23.2 $2,8 <br />4 Construct final drainage channel, riprap & filter fabric 17.0 $3,9 <br />5" Apportioned revegetation costs 1.86 acres .Ss <br /> TOTAL REVEGETATION COSTS <br />6*** Includes all areas @ 10.7 acres 16 $4,9 <br /> MOB/DEMOB <br />7 Initial Mob/Demob costs 6.2 $2,9' <br />8 Pond removal, ditch rnnstruction, revegetation Mob/Demob 4.2 $6 <br />9 Site maintenance/equipment & labor costs. 5 trips in 10 years 40 $5,6 <br /> Total hours & direct costs 326.8 $83,9 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability insurance: 1.55% $1,301 <br /> Performance bond: 1.05% $881 <br /> Job superintendent : Y= hrsx$36.25/hr 163.4 $5,923 <br /> Profit: 10% $8,392 <br /> Total Overhead & Profit: $16,4 <br /> CONTRACT AMOUNT (Direct + O&P) $106,6 <br /> ENGINEERING & PROJECT MANAGEMENT <br /> Engineering and bid preparation 4.25°k $3,567 <br /> Reclamation management 5.00% $4,196 <br /> Total indirect costs 37,7 <br />AL <br />
The URL can be used to link to this page
Your browser does not support the video tag.