Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 037 State :Colorado PermiUob # : C-81-035 <br />Date : 11/21/2005 County :La Plata Abbreviation :none <br />User : TAK Site :King Coal Mine Filename : C035-037 <br />Permit or other job action : Tr-9 <br />Task description : Mobilize/Demobilize <br />for Pond Removal <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 90T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $24.23 $28.32 $30.84 <br /> Operating cosUhour : $30.25 $32.95 $34.62 <br /> Operator cosUhour : $26.54 $26.54 $26.54 <br /> Helper cosUhour : $22.70 $22.70 $22.70 <br /> Total Unit CosUhour : $103.71 $110.50 $114.69 <br />Machine WeighUunit Ownership Haul Rig Fleet Size Haul Trip Retum Trip DOT permit <br />Description (Tons) Cost/hr/unit CosUhr/unit (No. units) CosUhr/fleet CosUhr/fleet CosUfleet <br />-CatD8R-8SU 52.22 $49.50 $114.69 1 $164.20 $114.69 $0.00 <br />sheet 1 of 2 <br />Subtotals : $164.20 $114.69 $0.00 <br />