Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task # : 023 <br />Date : 11/212005 <br />User : TAK <br />State :Colorado <br />County : La Plata <br />Site :King Coal Mine <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action : TR-9 <br />Task description : 8ac~ii and rearade two sediment <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat 08R Series II - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unit cost/hour : $146.67 Total fleet cosUhour : $146.67 <br />MATERIAL QUANTITIES <br />Initial Swetl Loose <br />volume : 3,226 CCY factor : 1.165 volume : 3,758 LCY <br />Source of estimated volume :Operator estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Conection Factors Source <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,017.1 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 7,500 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net cortection : 0.36 <br />Adjusted unit production : 361.42 <br />Adjusted fleet production : 361.42 <br />Permitlob# : C-8i-035 <br />Abbreviation :none <br />Filename : C035-023 <br />(Cat HB) <br />LCY/hr <br />LCY/hr <br />J08 TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 10.40 Hours <br />Unit cost : $0.406 /LCY Total job wst : $1,525 <br />