My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60633
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:27 PM
Creation date
11/20/2007 6:47:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
12/1/2005
Section_Exhibit Name
Appendix 9 Reclamation Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />RCRAPFR _ ANI Y WARK <br />PROJECT IDENTIFICATION <br />Cost Breakdown <br />Ownership cosVhour : $37.06 <br />Operating cosUhour : 579.48 <br />Operator cosVhour: $32.15 <br />Total and cosUhour: $148.68 <br />MATERIAL QUANTITIES <br />Basis <br />Material description <br />EaAh -Dry packed <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Cvcle Time (load + haul + spread + return <br />Travel time <br />Job utilization °h <br />NA <br />100 <br />NA <br />Total Fleet cosUhour <br />Scraper Bowl (volume) Basis <br />Horsepower : 365 <br />weight (UST) : 35.55 <br />Cost data source : (CRG) <br />$148.68 <br />Stmck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 1700 LCY <br />Adjusted capacity : 17.00 LCY "' <br />Loatling time : 2.00 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />baling time Gar paeon puahyull models <br />Route I Distance (feet) Grade (°h) Roll. res.(°h) Total res.(°h) Velocity (fpm) I Travel time (min.) <br />Haul: 1,100 -6.0 5.0 -1.0 2,931 0.45 minutes'" <br />Return : 1,100 6.0 5.0 11.0 7,066 1.03 mrnutes " <br />^ trevel time atl4lsted for acceleration and deceleration at load eM dump points <br />velocities ere maz. adainebla per IMeI resistance shown, not average <br />Job Condition Cortection Factors <br />Site altitude (feet) : 7,400 <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (i shi/f/dayJ <br />Nel job wrcection factor : 0.83 <br />JOB TIME AND COST <br />Fleet s¢e : 1 Scraper(s) <br />Und cost : $0.734 /LCY <br />Total cycle time 4.18 minutes <br /> <br />Adiusted Houdv Production <br />Unadjusted and production : 244.10 LCY/Hour"' <br />Adjusted unit production : 202.60 LCYMour <br />Adjusted Fleet production : 202.60 LCYIHour <br />' 1 timm volume on puahyull models <br />Total job time : $.22 Hours <br />Total job cost : $778 <br />
The URL can be used to link to this page
Your browser does not support the video tag.