Laserfiche WebLink
Metats by 200.8 <br />Method EPA200.8 Revision 5.4 <br />Matrix Spike And Matrix Spike Duplicate <br />Lab Name: Paragon Analytics <br />Work Order Number: 0604007 <br />Client Name: CEMEX, Inc. <br />ClientProject ID: A and c Pit <br />^_' ~~~ ~~ ~~~""~~~~"~ <br />FI"etd~ Ut A-Pit Se 8Th <br /> <br />=~.Lablk):m 0604007-2MS <br />t~~+~--._~ ~:---:r Sample Matrlx:WATER <br /> <br />Moisture: N/A <br /> <br />Date Collected:30.Mar-O6 Prep Batch: IP060407-22 <br /> <br />QCBatchlD: IP060407-22-1 <br /> <br />Run ID: im060407-tat Sample Aliquot: <br /> <br />Final Volume: <br /> <br />Result Units: ug/I SO mI <br /> <br />50 ml <br /> Date Extracted:07-Apr-O6 Cleanup: NONE File Name: 07APRO6A <br /> Date Analyzed: 07-Apr-O6 Basis: As Received <br /> Prep Method: EPA200.2 <br /> <br />CASNO Target Analyte Sample Samp MS MS Reporting Spike MS% Control <br /> Result Qual Result Qual Limit Added Rec. Limits <br />7782-49-2 SELENIUM 2.8 43.4 1 40 702 70-130% <br />7440-28-0 THALLIUM 0.2 U 1.79 0.2 1 179 70-130Yo <br /> <br /> Sample Matrix:WATER <br />Moisture: N/A Prep Batch: IP060407-22 <br />DCBatchlD: IP060407-22-1 Sample Aliquot: <br />Final Volume: 50 m1 <br />50 ml <br /> Date Collected: 30-Mar-O6 Run lD:im060407-tat Result Units: ug/I <br /> Date Extracted:07-Apr-O6 Cleanup: NONE File Name: 07APR06A <br /> Date Analyzed: 07-Apr-06 Basis: As Received <br /> Prep Method: EPA200.2 <br /> <br />CASNO TargetAnalyte MSD MSD Spike MSD% Reporting RPD RPD <br /> Result Qual Added Rec. Limk Limit <br />7762-49-2 SELENIUM 42.6 40 700 1 20 2 <br />7440-28-0 THALLIUM 1.2 1 120 0.2 20 1 <br /> <br /> <br />Field ID ~ A-Pit Se & Th <br />rs° <br />t;ablD; <br />~~ <br />0604007-2MSD <br />Data Package ID: im0604007-1 <br />Date Printed: W ednesday, April 19, 2006 Paragon Ana/ytics Page 7 of 1 <br />LaAS Version: 5.340A <br />10 <br />