My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60581
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:25 PM
Creation date
11/20/2007 6:45:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/3/2002
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR24
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 184 State :Colorado PermiUjob# : C-96-083 <br />Date : 07/02/2002 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 2 Mine Filename :C083-184 <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :Minor Revision 24 <br />Task descdption :Replace Topsoil from Stockpile to Drill Pads <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.50 NA <br /> OperatingcosUhour : $65.98 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $27.99 NA <br /> Total unit cost/hour : $143.48 Total fleet cosUhour : $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3,230 CCY factor : 1.125 volume: 3,634 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (pos) <br />Average site altitude : 7,500 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.