Laserfiche WebLink
• 2.05.3(3} <br />Sedimentation Pond <br />The sedimentation pond for the planned surface support facilities <br />area is shown on the Mine Facilities Map (Map 10). The design of <br />this sediment pond is presented in Exhibit 11. Further discussion <br />of the sedimentation pond is presented in Sections 2.05.3(4) and <br />4.05.2. <br />The sediment pond was originally constructed upon issuance on the <br />permit revision which approved the construction of the Bear No. 3 <br />Mine surface facilities. During August 1993, the sediment pond was <br />reconstructed. <br />Exhaust Fan <br />An exhaust fan is located on the portal pad of the Bear No. 3 <br />Portals area. This fan is used to provide ventilation for the <br />underground mine workings. <br />• Haul and Access Road <br />The haul and access roads for the Bear No. 3 Mine are shown on the <br />Mine Facilities Map (Map 10) and the Road Design Map (Map 11). <br />Stipulation No. 21 requires the operator to monitor both the <br />operational and reclaimed configuration of the portal access road <br />and portal facilities of the No. 3 Mine. Monitoring is to continue <br />on a semi-annual basis until two years following completion of the <br />reclamation of the portal access road and portal facility area. <br />Results of the monitoring are to be submitted to the Division <br />within 30 days following completion of each monitoring episode. <br />Bridue <br />A bridge crossing the North Fork of the Gunnison river is utilized <br />to gain access to the property. <br />• <br />2.05-21 Rev. 01-31-96 <br />