Laserfiche WebLink
i \ <br />E3:riIHIT E <br />keclarnation Plan: <br />A. The material will be mined in such a manner as <br />to leave a finished countour that blends with <br />the natural appearance. <br />B. Top soil has not been saved and due to the thin <br />layer it probably would not be feasible to try <br />to stockpile it. <br />l:. The subsoil will be smoothed over the area when <br />the time comes to reclaim the pit area. It is <br />not planned to close this pit in the near future <br />as it is relatively new and a good source of <br />road materialf <br />U. The subsoil when mixed in with the gravel which <br />contains some clay will support a vegetative cover. <br />The following mixture of grass seed will be planted. <br />~ lb. Sand Love Grass <br />3 lbs. Blue Gramma <br />2 lbs. Sand Blue Stem <br />1 lb. Switch Grass <br />1 lb. Sweet Glover <br />At the time of seeding or immediately before the <br />area to be seeded will be treat$d with 50 lbs. <br />of Nitrogen per acre. <br />E. Drainage ti~~ill not be a factor as there is no <br />surface or ground water. <br />F. 6rildlife will not be affected by the operation of <br />the pit or by the reclamation. <br />