6. Industrial Activity: Describe the primary industrial activities which take place on site. Include the type of facility (underground mine, surface mine,
<br />etc.) plus a brief description of the nature of the business and the industrial processes used. Include a description of the mining and coal preparation
<br />processes where applicable. ('fhe applicant may want to submit a process flow sheet.)
<br />The Carbon Junction Mioe is an inactive surface coal mine that is Currently in final retlamatioB. Fiual reclamation activities include
<br />bacldlline and eradine of the nit and anciliarv activity areas. retoosoiline of the disturbed areas. and reveeetation of the disturbed
<br />areas iD accordaote with the CDMG minioe and retlamation Dermit.
<br />7. Indicate whether an exploratory, active mining, inactive mining, or post mining operation or is the site hI temporary cessation.
<br />CurrentW the site is inattive, awaitine CDMG approval of chanees to the final reclamation Dlan. Final reclamation is antitioated to be
<br />implemented beeionine iD Jaoaarv 2003.
<br />ff ezploratory, please submit any known water quality/quantity data relative to the discharge(s) and the receiving stream(s) Otat reflect the conditions
<br />prior to the present activity, the length of time the activity is expected to be under exploration and describe what activities will take place during
<br />exploration that wind have an 'vnpact on the quantity or the quahty of the discharge. IF post mining, describe areas affected and extent of reclamation
<br />completed and length of time elapsed since revegetation occurred. Aiso, specify whether any outfa0s previously described serve, pariialty or totally, a
<br />reclaimed area Include expected bond release date.
<br />8. Production: List the principal product(s) produced and current and maximum production rates.
<br />Coal wss the principal product produced from the Carbon JunctioD Mioe. There is no current DroductioD, No sustained lone term
<br />productiop occurred donne the life of the mipe. therefore there was po established mazimum productiop rite.
<br />9. Is this a seasonal operation? No X Yes It Yes, please list the months of operation.
<br />10. Intermittent Discharges: Except for stone runoff, are any of the discharges descnbed'm item 21 intennitten[ or seasonal?
<br />No Yes If Yeg describe the frequency, durafion sod tbw rate of eae6 d'ueharge occprtepee.
<br />Not Applicable, Storm runoff oply.
<br />11. Location Map: A 8h a 11 inch location map designating [he facility property, intake points, discharge points, each of its harardous waste treatrnent
<br />storage or disposal facilities, areas in post mining, each well where fluids from the facility are injected underground, those wells, springs, other surface
<br />waer bodies and drinking water wells listed in public records or otherwise known to the applicant and the receiving waters shall be submitted. The map
<br />shall extend one mfle beyond the property boundaries. The map shall be from a 7k or 15 minute USGS quad sheet, or a map of wmparable scale. A
<br />north arrow shall be shown. A larger map maybe included for reference if the permittee wishes.
<br />THE MAP MUST BE ON PAPER $'lsX l I FICHES OR PROCESSp7G OF YOUR PERMIT Wn.L BE DELAYED , See Attathld LOCHIIon M9D
<br />12. Site Map: A S;t a 11 inch map of the site shall be submitted showing faclity features (whenever possble) such as bufldings, ponds, diversion ditches,
<br />stream locations, numbered discharge points, sampling and flow monitoring points, land application areas, stockpiles, waste rock piles, topsoil pfles,
<br />location of french drams and/or spoils springs, crusher areas, mine drainage flow padrs, domestic wastewater treatment plants, power plants, track
<br />washing meal, explosive storage areas, parking lots, vehicle maintenance mess, chemical storage areas, etc. The outfafls shall be labeled to correspond
<br />with the numbers listed in item 21. A larger map maybe included for reference if ffie permittee wishes.
<br />THE MAP MUST RE ON PAPER $'hX 11 QtCHES OR PROCESSPIC OF YOUR PERMIT WB.L BE DELAYED , Ste Attached Site MaD
<br />13. Water Balance: Attach a line drawing showing all water flow through and from [he mine/preparation plant sites. Indicate sources of intake wateq
<br />operations wntnbuting wastewater to the etBuent, and treatment units labeled to correspond to the more dem8ed descriptions m item 21. Construct a
<br />water balance on the line drawing by showing average flows between intakes, operations, treatment units and outfafls. If a water bahmce cannot be
<br />determined, provide a pictorial description of the nature and amount of any sources of water and any coflection or treatment measures. If not applcable,
<br />please htdicate.
<br />Not Apolica bk. No process water used.
<br />
|