Laserfiche WebLink
COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: ~A2/l~ ~~~~(/~ Date: /D -?- 9 ¢ _ <br />Pond Number: S Date Last Inspection: 7-2~ 9~_ <br />Site Name: ~J'.v- OF~~c~ Quarter: ~,,,~~1 /74~ <br />1. Design Depth Measured From Spillway Invert . <br />2. .Design Maximum Sediment Level Measured From Spillway Invert <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert . <br />4. Water Level Measured From Spillway Invert <br />S. Discharge Through Spillway Since Last Inspection . <br />6. Ri 11 s and Gullies , <br />7. Vegetation Adequate <br />8. Outlet Channel Erosion . <br />9. Animal Burrows . <br />10. Cracks . <br />11. Seepage <br />12. Spillway Clogged , <br />13. Valves Operational <br />. /,zo <br />loo <br />ya.~.r <br /> <br />, Yes Y No <br />. Yes ~ No <br />. ~ Yes No <br /> <br />. Yes _~ No <br /> <br />. i. Yes _~ No <br />. Yes Y No <br />. Yes ~ No <br />. Yes X No <br />. X Yes No <br />ADDITIONAL COMMENTS: it/rwt <br />MAINTENANCE REQUIRED: <br />-- 4 F- <br />3 u <br />V (L {~ Y~ <br />sPiccwar INV! <br />~ ~ -- - ~ ~ - <br />o ~ 2 a ~ a <br />W <br />t ~ h v A_ Q <br />