My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60472
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60472
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:21 PM
Creation date
11/20/2007 6:43:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Nieed Land 8eclamation Division <br />BSTIHATING FOflN - flYDHAULIC B%CAVAT08 NOBB <br />• Task #: 36 Prep. by: CBJ Task File Name: 0007-16 <br />Date: 03130192 Permit #:C-BO-007 Nine: West Blk Hioe <br />Permit Action: Renewal <br />Task Description: Begrade Sediment Ditches i2-14 <br />BOUBGY BQUIPNBNT COST <br />Basic Machine: CAT t25B (1989 Shift Basis:!/day <br />Cost Breakdown: """""""""' """"" <br />'""'"""`""' Utilisation X Borsepower 145 <br />Ownership coetlhr = 527,47 N/A " " """ <br />Operating A overhaul cost/br= !21.39 100 Neight-tons: <br />Operator co~tlhr c (20.36 N/A """ "" <br />"""" (DGI hkml <br />Total egpt. unit cost/hr a #71.72 Total fleet cost/hr: #71.72 <br />MATBBIAL BUANTITIBS <br />Initial Swell Loose <br />Volume: 4,155.0 CCY Factor: 1.1T Volume: 4,340,6 <br />Source of quantity take-oft: Permit app, Map 52 and Table 41 on Pg. 2.05-31 <br />Source of est. swell factor: Cat Nandbook <br />NOUBLY PRODUCTION <br />Cycle Time - Basic cycle time va. job condition rating: BBLON AYC. <br />"""" " - Time value within basic rating: NBAN <br />Basic cycle time = 0.44 sin, <br />Bucket Capacity """"""' <br />............... <br />Bated capacity: 1.27 LCY (heaped) 9ise class: medium <br />Bucket Pill factor: 0.90 Other - soil, boulders, roots (80 -100X) <br />Adjusted capacity: 1.14 LCY <br />Job Condition Correction Factors - Altitude adj. _ J.00 (C/H fjl) <br />"""""""'"""""""""' - Job efficiency : 0.83 (Is/d nmal <br />Site altitude = 6,300 ft. ----•-------- <br />"`""' Net correction 0.83 <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />i Boa ~osr <br />Fleet vise: 1 Bxcavato <br />Unit Cost : 50,549 /cu, pd. <br />157,29 LCY/Br <br />130.55 LCY/Br <br />130.55 LCY1Nr <br />r(e) Total Job Time: 37.08 Hours <br />Total Job Cost: #2,659.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.