Laserfiche WebLink
Colorado Hined Land @eclaaatioo Division <br />BSTINATING FO6M - NYD@AULIC B%CAVATOB NOBB <br />• Taak 5: 31 Prep, by: CBJ Task File Naae: COOT-31.NH6 <br />Date: 03/30192 Perait 4:C-80-OOT Mise: Nest Blk Mine <br />Perait Action: 6enewal <br />Tack Description: Backfill/@egrade Sediaeat Pond MB-4 ILoadout~ <br />HOURLY BAUIPNBNT COST <br />Basic Machine: CAP 2258 (1989 Shift 8asis:l/day <br />Coat Breakdown: •••,•..'......,•." •"•...'., <br />"""""""' Utilisation % Norsepoxer : 145 <br />Ownership cost/hr c =27.47 N/A """""' <br />Operating d overhaul cost/hr- 523,39 100 Height-tons: <br />Operator coat/hr : 220.86 N/A """""' <br />....,.'• (DAI Aka( <br />Total egpt. unit cost/hr a 591.72 Total fleet cost/hr: 171,72 <br />NATB@IAL`AUANTITIBS <br />Initial Sxell Loose <br />Voluae: 240.0 CC4 Factor: 1,17 Voluae: 299,6 <br />• Source of quantity take-off: Perait app., Voluae 7, 6rhibit 44 <br />Source of est. swell factor: Cat Handbook <br />HOURLY P@ODUCTION <br />Cycle Tive - Basic cycle tine vs. joh condition rating: SBVBHB <br />"""'""' - Tiae.value within basic rating: MBAN <br />Baaic cycle tine _ 0.55 sin. <br />Bucket Capacity """"" "' <br />bated capacity: 1.27 LCT (heaped) Size class: aediua <br />Bucket fill factor: 0.90 Other - coil, boulders, roots (80 -100X~ <br />6djueted capacity: 1.14 LCY <br />Job Condition Correction Factors - Altitude adj. = 1.00 ICIH fj!) <br />"'"""""""""'""""""' - Job efficiency : 0,83 (ls/d naa( <br />Site altitude : 6,300 ft. ------------- <br />"""' .Net correction 0,83 <br />Unadjusted hourly wait production ; 124,69 LCY/Hr <br />Adjusted hourly wait production 103.49 LCY/Hr <br />Adjusted hourly fleet production : 103,49 LCY/Hn <br />JOB COST <br />Fleet size: 1 &scavator(s) Total Job Tiae: 2.70 Hours <br />Unit Cost : 50.693 /cu. yd. Total Job Cost: (193.95 <br />