Laserfiche WebLink
Colorado Nined Laod 8eclanation Division <br />BSTItlATING F08M - GIPPING W088 <br />------------------------------ <br />• Task 1: 21 Ptep. by:CBJ Taek filenaae : 0007-21 <br />Date: 3l-Nar-92 Perait 4:C-80-007 Mioe: Mest @lk Nine <br />Perait Actioa: @eaeual <br />Task Description: Sip Bear 41 Nine (including road) <br />NOU@LV BQUIPNBNT COST <br />------------°------- Basic Machine: DBN @orsepoxer : 285 <br />--------------------- <br />Blade Type: Universal """ " """' <br />Attachaent 41: @OPS Cab Shift Basis: 1/Day <br />Attachaent 12: 3-shank ripper """"""""" <br />Utilisation % <br />Cost Breakdown -Ownership cost/hr = !45.79 N/A <br />"""""'"" Operating cost/hr _ 142.06 100,00% <br />@ipper oprtg, eoet/hr = 14,54 IOO.OOX <br />Operator cost/hr = 120.98 N/A <br />Total _ f113,06 Total fleet cost/hr: 1113.06 <br />NAT6@IAL QGANTITIB9 """"' """""'-"' <br />------------------- <br />------------------- <br />Specify desired nethod (type 'voluoe° or °area°~: Area <br />Yoluae """"""' <br />nethod: NA LCY-CCV s NA aat, load factor = 0 BC4 or CC9 <br />Area ............ .,.,... ............ <br />• aethod~ 5.00 Acres r 2,00 ft, avg, rip depth= 16,133 8CV or CCY <br />Source of quantity take-off: Voluoe 8, Bxhibit 45 <br />Source of nat. load factor: NA <br />NOU@L7 P@ODUCTION <br />Yoluae Nethod - 9eisaic velocity of aaterial: feet/sec. <br />""""""' - Unadjusted hourly production:. BCY or CCY/hr <br />Area Nethod - Avg, ripping depth per pass: 2.00 feet <br />"""""' - Avg, rippint width per pass: 8.00 feet <br />- Avg. rippin8 length per pass: 200.00 feet <br />- Avg. velocity of aachine 60.00 feet/sin. <br />- Avg. aachine naaeuver tine 0.25 ninutes <br />- Boutly prod. per unit area :26,790.70 sq. feetlhr <br />- Unadjusted hourly production: 1,984.50 BCT or CCT/hr <br />Job Condition Correction Factors - 'Jnadjusted production _ 1,984.50 BCY or CCT/hr <br />"""""""""""""""" -Site altitude - 6,300 feet <br />- Altitude adjuetaent - 1,00 <br />- Job efficiency factor = 0.83 <br />- Net correction = O.B3 nultiplier <br />- Adjusted production - 1,647.13 BCT or CC9/hr <br />• - Fleet production - 1,647=13 BCT or CCYIhr <br />JOB COST <br />Fleet aiae = 1 Unit(s) Total job tine= 9,79 Noure <br />-------- ----------- <br />-------- ----------- <br />Unit cost =0.069 /BG7 or CCy Total job cost= 11,107,40 <br />-------- ----------- <br />-------- ----------- <br />