Laserfiche WebLink
Colorado Mined Laed Reclamation Division <br />BSTINATINC F06M - BULLDOZH6 NOBS <br />Task t: 2 Prep. 6y: CHJ,TDC Task Rile Name: 0007-2 <br />Date: 03/30/92 Permit #:C-80-007 Mine: Nest Blk Nine <br />Permit Action: Benexal <br />Task Description: Backfill/Grade Powder Magasine (incl. rd, to Nag,) <br />HOU6LT HOUIPMBNT COST <br />Cost Breakdown: <br />Basic Machine: Cat D8N <br />Blade Type: Universal <br />Attachment #1: BOPS Cab <br />Attachment #2: 3-shank ripper <br />Ownership coat/hr =45.78 <br />Operating A overhaul coetlhr- dozer = 137,52 <br />-tipper = 50,00 <br />Operator ~ostlhr - #20.68 <br />Total egpt. unit cost/hr = 5103.98 <br />Horsepower: 't B5 <br />Shift Basis: l/day <br />Utilisation X <br />NlA <br />100 <br />0 <br />N/A <br />(code 6kml <br />Total fleet costlhr: 5103,98 <br />MATBBIAL BUANRITIHS <br />Initial Swell Loose <br />• Volume: 1,028.0 CCV Factor: 1.165 Yolume: 1,197,6 LCy <br />Source of quantity take-off: Permit App., Yolume 7, Hxbibit 41 <br />Source of est, swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />"""" """"' lob Condition Correction Factors <br />dvt~ push distance: 30 ft. """"""""""""""""' <br />"""" ' Operator..,.,...,. 0,75 lavg,l <br />Unadjusted hourly Nat, consistency., 0.90 (Cat tbl( <br />dozer production: 1593 LCYlbr Dosing nethod,.... 1,00 (gem.l <br />"""" ' Visibility,....,,, 1,00 (avg,~ <br />Material consistency: lob efficiency,,., 0,83 (lsh/day( <br />Compacted fill or embankment Transmission type, 1.00 ( PS ~ <br />""""""""""""""""""` Ctade adjustment.. 0.14 (Cat tbl( <br />Avg, push gradient: 11.00 X (pos) Altitude adj...,.. 1,00 (Cat this <br />""""" Material xeight,..: 0,79 (Cat tbl( <br />Avg, site altitude: 6300 ft. Slada type.,,.,,., 1.00 (S or U( <br />Material weight 2900.00 1bILCY Net Job Correction 0,33 <br />Nat, Descr.; ........ . ..... ........ <br />Deconposed rock - 50X Bock, 50X Barth Adjusted Uoit Prod,: 528,2T LCYlbr <br /> Adjusted Fleet Production: 526.2T LCYlbr <br />• JOB COST "" """"' <br />Fleet vise 1 Doser(s~ Total Job Time: 2.28 Hours <br />Unit Cost 50.198 <br />......... /LCP Total Job Cost: <br />..... ;236.62 <br />........ <br />