Laserfiche WebLink
sheet 1 of 4 <br />Colorado Nined Land 8eclanation Division <br />BBCLANATION COST SUNNABY FOBN <br />----------------------------- <br />----------------------------- <br />P68NIT NUMBBB : C-80-007 PBBP. BY :CBJ,TDG FILBNANB :0007-O,YH1 <br />DATE : 15-Nay-92 OPBBATION:Yeat Blk Nine-Nountain Coal Coapany <br />PBBNIT ACTION Perait Benexal <br />I. DI68CT COSTS <br />A. BABT8YOB8 - BACHFILLINC d BOUCB CBADIHG <br />Task No.; Task Description ; Coat (fl <br />, <br />1 Portal Bench ; f36,696 <br />2 ; Poxder Nagasine (including road to ~agasiael ; 1237 <br />3 Bub-station ; f212 <br />4 ; Baul coal aaterial iron Stack Tubes to Waste Pile; (20,059 <br />S Haul coal naterial iron Silo 6rea to Waste Pile ; (6,213 <br />6 ; Shop/Marehouse ; (1,204 <br />7 Nex Office Building/Bark Bouae ; (2,941 <br />8 ; Parking Lot and Teaporary Office Trailers (7,112 <br />9 ; Yater Storage Tank (including road to tank( ; (158 <br />10 ; Sylvester Culch Ventilation Fan ; f41 <br />11 Haul Benaining naterial fron snail energency coal; <br />stockpile at crusher to Yaste Pile ; S1,T38 <br />, <br />• , <br />, <br />; <br />Subtotal (AI: f76,677 <br />B. BABY8N068 - BIOBYALL ABDUCTION <br />Task No.; Task Description ; Ccet (SI <br />NA No Highxall Beductioa Acquired • ; !0 <br />, <br />, <br />, <br />Subtotal (B(:_---- - 30 <br />C. AAATBYOBB - YASTA PILB COV88 PLACBNBNT <br />Taak No.; Task Descriptioa Cost (fl <br />NA • ; Upper Refuse Pile is not planned far pernit tern ; $0 <br />12 ;Grade all ungraded refuse naterial (9,985 <br />• 13 ; Final shaping of lower refuse pile ; (5,339 <br />NA ; Yaate Pile cover conpleted in Task 40 ; f0 <br />NA ; Conpaction of refuse aaterial included in Task 15; $0 <br />Subtotal (C(: (15,324 <br />