Laserfiche WebLink
III III III IIIIIII III Doc Date:1y1112001 <br />sss <br />•S1~ <br />((2.05.6(1) Air Pollution Control Plan~~ <br />Where necessary, haul roads, access roads, and processing <br />equipment transfer points that may be potential sources fior <br />dust, will be equipped or provided with means to control the <br />dust. <br />Haul road and access road control will be provided by water <br />truck equipped with spray bar. Watering of the roads will be on <br />a periodic basis during mining operations as necessary. <br />Transfer points control will also be by watering from spray bar <br />positioned at the appropriate locations to abate dust. No <br />runoff ofi excess water from dust control is expected. <br />• <br />r1 <br />L J <br />