for salvaging available topsoil by May 3, 2001 (completed); and implement the approved minor
<br />permit revision by July I, 2001, later extended to September 17, 2001.
<br />NOV CV-2001-008 Issued 4/20/01
<br />Action Taken Abatement requved OMI to dispose of drilling mud at an approved location by
<br />June 15, 2001 (completed) and reclaim the mud pits by July 1, 2001, later extended to
<br />September l7, 2001.
<br />(3) (t) The fmal resolution of anv notice of violation.
<br />NOV Proceedines Violation Notice Penal
<br />CV-2001-007 Completed Terminated Paid
<br />CV-2001-008 Completed Terminated Paid
<br />(4) Any changes in Section 2.03.5 occurring between the date the permit transfer application is
<br />submitted and approval of permit transfer will be incorporated prior to fmal permit transfer
<br />approval.
<br />2.03.6 Right of Entry and Operation Information
<br />(I) Detailed leeal description of the permit boundary, description of the documents upon which the
<br />transferee bases its legal right to enter and begin coal mining ouerations and whether that right is
<br />the subject of pending lineation:
<br />Permit 13oundarv - Legal Description
<br />The surface facilities for the Elk Creek Mine, Sanbom Creek Mine, and the former Somerset Mine are located nosh
<br />of the town of Somerset, which is nine miles northeast of Paonia, Colorado. All are north of [he North Fork of the
<br />Gunnison River (located due south of the town of Somerset) and north of State Highway 133 and the Union Pacific
<br />Railroad rights-of--way. The Elk Creek Mine is located approximately one mile north and the Sanbom Creek Mine
<br />is located approximately one mile east of the town of Somerset.
<br />The Elk Creek Mine and Sanborn Creek Mine permit area is located on the following described lands.
<br />Township 12 South, Ranee 90 West. 6'" PM
<br />Sec. 29: S'hSW'/., SW'/.SE'/.,
<br />Sec. 30: S'hS'/:
<br />Sec. 3l: All
<br />Sec. 32: Lots 2, 3, 4, 5, 6, 7, 10, 1 I, 12, 13, 14, 15, W'hNE'/., NW'/.
<br />Townshin I2 South, Ranee 91 West. 6'" PM
<br />Sec. 25: S%,S%:
<br />Sec. 26: S'hS'/:
<br />Sec. 27: SE'/.SE'/.
<br />Sec. 34: Lots 1, 8, 9, I5, 16, E'hNE'/.
<br />Sec. 35: All
<br />Sec. 36: All
<br />Townshiu I3 South, Ranee 89 West. 6'" PM
<br />Sec. 6: Lots 17, 21, 22
<br />Sec. 7: Lots 1, 2, and 3 North of the Centerline of the River
<br />Township l3 South, Ranee 90 West, 6'" PM
<br />Sec. l: All
<br />Sec. 2: All
<br />Sec. 3: Lots 10, 11, 12, 13, 14, I5, 16, 17, 18, S%:SW'/.
<br />Sec. 4: Lots 13, 14, I5, 16, S%:S%:
<br />Permit Transfer (OMI to Oxbow Mining, LLC) 2.07-9 Revised' 9/16/01
<br />
|