My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26448
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:57 PM
Creation date
11/20/2007 6:42:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
4/14/2006
Doc Name
1st Qtr 2006 Stockpond Inspections
From
Seneca Coal Company
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Roy Karo <br />FACILITY CONFIGURATION: Stockpond <br />SITE NAME: T-20 <br />MINE NAME: Seneca II-W <br />MINE I.D. NO.: C-82-057 <br />3 lL Q <br />DATE: <br />DATE LAST INSPECTION: <br />LOCATION: NW'-~NE~, Sec 15, TSN, R88W <br />LOCATION: 8 mi S of Hayden, CO <br />OWNER'S REP.: Roy Karo, Manager <br />Circle or write in appropriate response <br />1. Angle of slope: 3.9:1 upstream, 9.6:1 downstream <br />2. *Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on crest: <br />4. Cracks or scarps on slope: <br />5. Sloughing or bulging on slope: <br />6. *Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />B. *Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: <br />11. Increase Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />19. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />feet <br />feet <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions Noted in these items should Normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />comments: NOT ,q-CG~3s~3LE -'T^~a~^I CauCr~'ED <br />Total = 8.5:1 N/A <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.