My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26415
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:55 PM
Creation date
11/20/2007 6:37:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
1/13/1994
Doc Name
4th Qtr 1993 Inspections
From
PEABODY WESTERN
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />ItJSPECTOR'S NAME: Dennis Jones DATE: 11 /11/93 <br />FACILITY CONFIGURATION: Stockoond DATE LAST INSPECTION: 6 /10/93 <br />SITE NAME: T-11 SITE LOCATION: NW'a SE'~, Sec 12, TSN,R87W <br />MINE NAME: Seneca II LOCATION: 7.1 mi SE of Ravden, Colorado <br />MINE I.D. NO.: C-RO-005 OWNER'S REP.: Scott Williams, Supt. <br />Circle Or Write in BbDrOpriatB re5pOn5e <br />1 <br />2 <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10 <br />11 <br />12 <br />13 <br />14 <br />Angle of elope: 3:1 upstream, 2:1 downstream <br />+Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Total = 5:1 N/A <br />Yes (NO.' N/A <br />Yea `Noi N/A <br />Over widespread areas: Yea ~No N/A <br />From downstream foundation area: Yes ~Ny- N/A <br />"Boil s" beneath stream or ponded water: Yes LNO~ N/A <br />Cracks or acarpa on crest: <br />Cracks or acarpa on slope: <br />Sloughing or bulging on slope: <br />+Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />*Erosion of toe: <br />*Water impounded against downstream toe: <br />Existing embankment freeboard: from crest = <br />Increase Decrease in water level: <br />Cracks, bulging, or erosion on upstream face:' <br />Spillway erosion: <br />*Clogging <br />Spillway channels: <br />Diversion ditches: _ _ <br />Yea No ~~ N/A <br />Yes c1`Io~ N/A <br />Yea LNG N/A <br />Yes <Ny7 N/A <br />Yes ~No; N/A <br />Yes ~fl~ N/A <br />Yes C~ N/A <br />2 feet (approx) <br />_ feet <br />Yes LNoi N/A <br />Yes ~NJ N/A <br />Yes Cyn~ N/A <br />Yes No QJ~' <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.