My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26415
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:55 PM
Creation date
11/20/2007 6:37:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
1/13/1994
Doc Name
4th Qtr 1993 Inspections
From
PEABODY WESTERN
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockpoads or Sumps <br />INSPECTOR'S NAME: Dennis Jones DATE: 11/11/93 <br />FACILITY CONFIGURATION: Stockoond DATE LAST INSPECTION: 6/10/93 <br />SITE NAME: T-1 SITE LOCATION: SE~tSWk, Sec 2, TSN, R87W <br />NINE NAME: Seneca II LOCATION: 7.1 mi SE of Hayden, Colorado <br />MINE I.D. NO.: C-80-005 OWNER'S REP.: Scott Williams, Supt. <br />Circle or write is aDprOpriet0 re6pOnae <br />1 <br />2 <br />Angle of slope: 3:1 upstream, 4:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />~~Boils" beneath stream or ponded water: <br />3. Cracks or scarps on crest: <br />4. Cracks or scarps on elope: <br />5. sloughing or bulging on slope: <br />6. •Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />8. •Erosion of toe: <br />9. •Water impounded against downstream toe: <br />10. Existing embankment freeboard: from crest <br />11. Increase Decrease in water level: <br />12. cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />14. •CLogging <br />Spillway channels: <br />Diversion ditches: <br />Yes ~ N/A <br />Yes ~ N/A <br />Yes ~Cl~ N/A <br />Yes LN~ N/A <br />Yes ~N~ N/A <br />Yes ~ N/A <br />Yes LRo~ N/A <br />1 feet (approx) <br />_ feet <br />Yea No ) N/A <br />Yes <br />~,_., No N/A <br />Yes ~ND~ N/1~_ <br />Yes No ~I~AJ <br />•Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions <br />noted in these items should normally be described (extent, location, volume, etc.) in the <br />space on the back of this sheet. <br />Total = 7:1 N/A <br />Yes ~ No~ N/A <br />Yes ~ N/A <br />Yes CNg/ N/A <br />Yes /N~ <br />` N/A <br />Yes ~~ N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.