My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60239
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:13 PM
Creation date
11/20/2007 6:37:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
10/3/2005
Section_Exhibit Name
Tab 14 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Regrading of the lower parking area and the preparation plant will begin with <br />clean-up of refuse and coal stockpiles. This material will be placed in the <br />RSRDA or CRDA-1. Concrete, asphalt and other non-toxic material <br />remaining after demolition of the surface facilities will be dozed into the area <br />to be backfilled along the east edge of this site. Additional soils will be graded <br />over this fill to establish the final contours shown on Exhibit 6C. Again, topsoil <br />was not salvaged for this area, so some of the best available soil in this area <br />will be used as the final cover. <br />Excess material taken from this area will be used to complete the cover for <br />the RSRDA and fill elsewhere on the site. Reclamation of this area will <br />include Haul Road 1. The 9.5' diameter conveyor culvert under this area <br />leading under the highway and over to the river will be left in place. The <br />conveyor culvert will be demolished and backfilled where it emerges from the <br />ground west of the I-70 frontage road. A minimum of 100-feet of culvert will <br />be filled with soil. The 4-inch diameter mine dewatering pipe which runs <br />through the conveyor culvert to outfall 001 will be abandoned. <br />Access Road 1 will be backfilled and graded when no longer needed for <br />access to the portal bench or the RSRDA. The original road cut was below <br />sections of nearly vertical rock faces. Fill on this road will begin near the <br />center of the road and extend to a height of approximately 15' leaving some <br />• vertical rock faces. Care will be taken when filling this area to use the best <br />soils for final cover. <br />The drainage plan for the South Portal is shown on Exhibits 6C and 26. Run- <br />off calculations are presented in Appendix 14-6, pages 14-6-1 through 14-6- <br />18ix. The drainage ditches will be constructed except where they cross pond <br />8 and pond 9. Pond 8 will receive interim run-off from ditch segments E, F <br />and G. Pond 9 will receive interim run-off from the RSRDA upper diversion <br />ditch, segments A, B and C, and a portion of the lower bench of the RSRDA. <br />The ditches will temporarily discharge into the two ponds to provide <br />sedimentation control until their removal is approved by the DMG. Once pond <br />removal is approved, the ditches will be constructed "through" the reclaimed <br />ponds so the final drainage configuration is complete. Ditch section H-H' will <br />be constructed after pond removal is approved. <br />Miscellaneous grading for the site will be at the A substation, Light Use Road <br />1, and the Water tank shown on Exhibit 6A, Tab Section 13. Grading of these <br />sites will involve minor cuts and fills to blend in with adjacent surface <br />contours. B-Substation was removed and the area graded during 2002. <br />• 14-8 (Rev. 12/02) <br />