My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE60234
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE60234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:07:13 PM
Creation date
11/20/2007 6:36:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004020
IBM Index Class Name
Permit File
Doc Date
3/16/2004
Doc Name
New 112c Appl
From
MA Concrete Construction Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br />Responsibi-ities as a Permittee: <br />Upon application approval and permit issuance; this application becomes a legally binding document. Therefore, there aze a <br />number of important requirements which you, as a permittce, should fidly understand. These requirements are listed below. <br />Please read and initial each requirement, in the space provided, to acknowledge that you understand your obligations. Ifyou do not <br />understand these obligations then please contact this Office for a full explanation. <br />1. Your obligation [o reclaim the site is not limited to the amount of the fmancial warrantu. You assume legal <br />liability for all reasonable expenses which the Board or the Office may incur to reclaim the affected lands associated <br />with your mining operation in the event your permit is revoked and fmancial warranty is forfeited; <br />2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a fmding that the pemrittee violated <br />the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information contained in the <br />application or your permit misrepresent important material facts; <br />~'~ 3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, <br />substantial civil penalties, to you as permittce can result; <br />~_ 4. Any modification to the approved mining and reclamation plan from those described m your approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office; <br />5. It is your responsibility to notify the Office of any changes in your address or phone number; <br />,~ 6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the entrance of the <br />mine site, which shall be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br />Reclamation Board; and, <br />c. the pemrit number. <br />7. The boundaries of the permit boundary azea must be marked by monuments or other markers that are clearly <br />visible and adequate to delineate such boundaries prior to site disturbance. <br />8. It is a provision of this permit that the operations will be conducted in accordance with the terms and conditions <br />listed in your application, as well as with the provisions of the Act and the Construction Material Rules and Regulations <br />in effect at the time the permit is issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.