Laserfiche WebLink
Mr. Chris Weber <br />March 13, 2007 <br />Page 4 <br />12. Acceptance of these conditions is assumed unless a letter to the contrary is received by this <br />office, the Division 2 Engineer (Steve Witte, 310 East Abriendo, Suite B Pueblo, CO 81004) <br />and the Water Commissioner (John Van Oort, PO box 148, Rye, Co 81069) within two <br />weeks of your receipt of this letter. <br />13. By no later than April 15, 2007, provide the basis for the computation of historical native <br />vegetation consumptive use as required by Paragraph 10 of the General Guidelines for <br />Sut~stitute Water Supply plans for Sand and Gravel Pits Submitted to the State Engineer <br />Pursuant to SB 89-120 & SB 93-260. <br />Please contact Heidi Frey in Denver at (303) 866-3581, or Kalsoum Abbasi in <br />Pueblo at (719} 542-3368, if you have any questions concerning this approval. <br />Si erely, <br />~~ <br />ick Wolfe, P.E. <br />Assistant State Engineer <br />Attachrnent: Tables 1, 3, 4, & 5 <br />cc: Steve Witte, Division Engineer <br />John Van Oort, Water Commissioner <br />Carl Mount, Division of Reclamation, Mining, and Safety <br />OW/HCF:Transit Mix Consolidated Pueblo 2007.doc <br /> <br />