My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1980007A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2001-12-11_PERMIT FILE - C1980007A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 2:28:05 PM
Creation date
11/20/2007 6:34:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Old Permits
Section_Exhibit Name
Exhibit 07 NPDES Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, Water Quality Control Division <br />Rationale -Page 2, Permit No. CO-0038776 <br />• 1/!. PURPOSE OF AMENDMENT <br />ey letter dated April 30, 1996, the permittee requested that the Jlow limitation for outfall 007 be increased from 0.010 MGD ro <br />0.020 MGD because the wastewater treatmem facility (WWI'F) is undergoing an expansion. However, because this rystem is a <br />domestic WWTF, the permittee must receive site approval before the flow limitation can be increased and am other <br />modifications can occur, if appropriate. The permittee is cunemty going through the site application process that leads to site <br />approval. <br />Occasional exceedences of the current Jlow limitation may occur during this interim period. No exceedences of other <br />limitations have occurred nor are expected. /t should be noted that this outfall does not discharge directly to state waters, it <br />discharges to industrial pond MB-2R (ou¢a[l 004), which subsequently discharges to the North Fork of the Gunnison River. <br />By this permit action, no flow limitation will apply until site approval is granted. The permittee will cominue to be required ro <br />report flow at the frequency specified in Part /. B. 1. (e) of the permit. When site approval has been granted, the permittee needs <br />to notify the Permits and Enforcement Section so that the flow limitation can be amended to 0.020 MGD. <br />Page 5 of the permit (Pan l.A.1. (n) is amended by this action <br />!on C. Kubic <br />September 16, 1996 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.