R
<br />.nnrn'nrrnn,n. n ............................. ... ----'-
<br />= r ,
<br />,�. I r` _. II ROBERT P. &JDEAN
<br />� t
<br />10' UNITED
<br />POWER
<br />EASEMENT
<br />TIMOTHY D. & JERI E.
<br />REISBECK
<br />1,
<br />PERIMETER FENCE
<br />ALONG ALL PROPERTY
<br />LINES (TYP.)
<br />VILLANO
<br />Ira smons■■monom■■somms■
<br />VILLANO BROTHERS
<br />PROPERTIES, INC.
<br />50' GASLINE ��-
<br />EASEMENT GAS VdE_I
<br />y - - 9SETBACK
<br />75' SETBACK
<br />0
<br />North
<br />122' 0 50 100' 200'
<br />SETBACK �4
<br />SCALE: I" =300'
<br />North
<br />0 500' 600' 1200'
<br />SCALE: I"=600'
<br />r :r
<br />FLUSH WITH SOD AT E TO
<br />• • •
<br />2 �
<br />BE KEPT " FROM TRUNK.
<br />II . PL5/Acre
<br />ALTERNATE CONIFER GUYING
<br />r 1
<br />EQUALLY SPACED STEEL
<br />E-
<br />LUZ
<br />-_
<br />&RAVE. 6UY TO MID -POINT OF TREE
<br />6
<br />f FLAG WIRE WITH 1/2' DIAMETER
<br />Western .
<br />WHITE PVC, PIPE.
<br />r' / r • /
<br />_-
<br />2.
<br />5ET TREE IN PIT TO PROPER &BADE AND
<br />_
<br />11711=
<br />PLUMB. REMOVE REMAIMIN6 WIRE t
<br />114-1
<br />., r
<br />. •.> ..
<br />REMOVE A5 MUCA A5 POSSIBLE £
<br />IQ
<br />RA F-11
<br />��
<br />2/5 OF PIT, REMOVE TOP in OF BURLAP £
<br />OB
<br />COMPLETE BACKFILL. UNDI5TUR15M
<br />SOIL
<br />PLASTIC FLA661H6 TAPE. C49IJIFER5 TO
<br />I
<br />HAVE 2 STAKES FOR TREE5 V Al
<br />135
<br />LE55. 3 STAKES FOR TREE5 ABOVE 6'.
<br />ar :
<br />01111 UMVIN p, Ir, 10 W1111111M
<br />-
<br />I
<br />5ET ROOT GALL_ OF ALL TREE5 4"
<br />ABOVE GRADE IM IRRIGATED AREA5 AHD
<br />AT GRADE TO T ABOVE GRADE IN
<br />NON - IRRIGATED AREAS. MODIFY IF SOIL
<br />CONDITIONS WARRANT £ PER CITY
<br />DIRECTION. INSTALL A 5" HIGH BERM
<br />AROUND TREES TO CREATE A WATERIN6
<br />BA51N. BERM 15 TEMPORARY IN IRRIGATED
<br />AREA5. REMOVE BERM AFTER TWO
<br />THOROUGH WATERIN&5 IN IRRIGATED
<br />AREA5 £ MULGH.LEAVE BERM f MULCH IN
<br />NON- IRRIGATED AREAS £ IN AREA5 OKLY
<br />IR216ATED BY DRIP 5Y5TEM5 AFTER
<br />DRYLAND GRASS ESTABLISHMENT PERIOD.
<br />4" DEEP WOOD CHIP MULCH
<br />FLUSH WITH SOD AT E TO
<br />• • •
<br />2 �
<br />BE KEPT " FROM TRUNK.
<br />II . PL5/Acre
<br />ALTERNATE CONIFER GUYING
<br />r 1
<br />EQUALLY SPACED STEEL
<br />E-
<br />WITH WHITE TOPS, . SET FLUSH WITH
<br />5
<br />-_
<br />&RAVE. 6UY TO MID -POINT OF TREE
<br />6
<br />f FLAG WIRE WITH 1/2' DIAMETER
<br />Western .
<br />WHITE PVC, PIPE.
<br />©
<br />REMOVE BOTTOM 1/5 OF WIRE BA51KET.-
<br />2.
<br />5ET TREE IN PIT TO PROPER &BADE AND
<br />_
<br />11711=
<br />PLUMB. REMOVE REMAIMIN6 WIRE t
<br />114-1
<br />TWINE. IF PLASTIC OR TREATED BURLAP,
<br />- -III-
<br />REMOVE A5 MUCA A5 POSSIBLE £
<br />IQ
<br />BACKFILL. IF REGULAR BURLAP, BACKFILL
<br />ADEQUACY P N
<br />2/5 OF PIT, REMOVE TOP in OF BURLAP £
<br />OB
<br />COMPLETE BACKFILL. UNDI5TUR15M
<br />SOIL
<br />TREE PLANTING DETAIL
<br />NOT TO SCALE
<br />PRUNE DEAD OR DAMAGED
<br />59ANC4-ES PRIOR TO PLANTING.
<br />IF FORM I5 COMPROMISED BY
<br />PRUJIN6. REPLACE SHRUB.
<br />SPACE PLANT5 AND 5ET PLUMB
<br />FOR 5F-5T EFFECT.
<br />MOUND COMPACTED BACKFILL
<br />UDDER ROOT5AL1-- OR
<br />5ET OM UNDISTURBED SOIL.
<br />REMOVE ALL GONTRINERS, BA51K-E
<br />WIRE ETC. FROM ROOTBALL
<br />.or 5GHEDULE
<br />DO HOT PRUNE OR DAMA6E
<br />• • •
<br />CENTRAL LEADER.
<br />II . PL5/Acre
<br />WRAP TRUNK FROM &ROL&V
<br />r 1
<br />LEVEL TO 5EC.OHD 5RANC.1-I
<br />E-
<br />WITH 4" KRAFT TYPE TREE
<br />-_
<br />WRAP. SECURE ENDS WITH
<br />6
<br />FLEXIBLE TAPE.
<br />Western .
<br />5TANDARD 6UYIN& SYSTEM: (OKL.Y
<br />©
<br />WHERE HEGE55ARY) MIN. 6' LON6
<br />2.
<br />HEAVY DUTY T -BAR STEEL P05T
<br />• 1 h
<br />5TAKE5 WITH WHITE T-PO5T 6AP5
<br />x-
<br />AHD WITH 17 &AU&E &ALVAMIZED
<br />I.
<br />STEEL WIRE 6UY5 SECURED TO TREE
<br />r�
<br />WITH CANVAS 5TRAP ABOVE FI125T
<br />ADEQUACY P N
<br />BRANCH. WIRE TO 5E TAUT BUT HOT
<br />OB
<br />OVER- TIGHT.FLA& WIRE WITH WHITE
<br />r:rr 6raw
<br />PLASTIC FLA661H6 TAPE. C49IJIFER5 TO
<br />I
<br />HAVE 2 STAKES FOR TREE5 V Al
<br />135
<br />LE55. 3 STAKES FOR TREE5 ABOVE 6'.
<br />DEGIDUOU5 TREE5 TO HAVE 2 5TAKE5
<br />,11
<br />FOR TREE5 2 -1/2" CAL. AHD LE-55. 5
<br />STAKE5 ABOVE 2-11T GAL. OIJE 5TAKE
<br />ALWAYS IM DIRECTIOH OF PREVAILING
<br />C-reen kleedlegass
<br />WINDS. REMOVE 5TAKE5 £ 6UY5
<br />JIIII
<br />AFTER I SEASON.
<br />III
<br />-I PREPARED BAC.KFILL MIXTURE:
<br />1 =11 III
<br />-il1
<br />-1 L ONE PART COMPOST OR
<br />-1 1 1I
<br />i = APPROVED EQUAL
<br />111- III =Iii= iii- ill��lll= lll= ni =ni =ni = i�l =i7
<br />,� 2. TWO PARTS TOPSOIL.
<br />5. THREE PART5 NATIVE SOIL.
<br />DIAMETER 14x'5
<br />BALL WIDTH
<br />4. MATERIALS TO 5E THOROUGHLY
<br />BLENDED.
<br />TREE PLANTING DETAIL
<br />NOT TO SCALE
<br />PRUNE DEAD OR DAMAGED
<br />59ANC4-ES PRIOR TO PLANTING.
<br />IF FORM I5 COMPROMISED BY
<br />PRUJIN6. REPLACE SHRUB.
<br />SPACE PLANT5 AND 5ET PLUMB
<br />FOR 5F-5T EFFECT.
<br />MOUND COMPACTED BACKFILL
<br />UDDER ROOT5AL1-- OR
<br />5ET OM UNDISTURBED SOIL.
<br />REMOVE ALL GONTRINERS, BA51K-E
<br />WIRE ETC. FROM ROOTBALL
<br />.or 5GHEDULE
<br />5dentific khrie
<br />• • •
<br />EXI5TIM6 WATER
<br />II . PL5/Acre
<br />', oF Mix
<br />r 1
<br />..
<br />E-
<br />-
<br />-_
<br />POWER
<br />6
<br />••. 1r
<br />Western .
<br />Arrba
<br />©
<br />_
<br />2.
<br />•1 • i II.
<br />• 1 h
<br />-4__5
<br />x-
<br />FEMGE
<br />I.
<br />4/8/05
<br />KF
<br />7
<br />ADEQUACY P N
<br />4 15 OS
<br />OB
<br />i1., xew •.u.:rr ..
<br />r:rr 6raw
<br />Va4wli kfte
<br />I
<br />15%
<br />135
<br />,rr Vrdb
<br />C-reen kleedlegass
<br />Lodomn
<br />.•:
<br />/r cr pxr :r
<br />• r Praneclover
<br />go-
<br />• r • 11 r •
<br />• . . r . :
<br />Sphaffalow cocchw
<br />5carlet blobanallow
<br />--IIIIIIIIIIIIIIII-
<br />LEGEND:
<br />-
<br />PERMIT BOUNDARY
<br />-
<br />EXI5TIM6 WATER
<br />- - O- -
<br />EX 15T I M6 I' CONTOURS
<br />1
<br />EXISTING POWER POLE
<br />E-
<br />EX15TIM6 OVERHEAD
<br />2
<br />POWER
<br />6
<br />EXISTING GA5 LINE
<br />'tl
<br />qmpqpqkw
<br />6A5 MARKER
<br />©
<br />PETROLEUM WELL
<br />U
<br />6A5 /01 L EQU I PMEMT
<br />III
<br />TELEPHONE PEDESTAL
<br />x-
<br />FEMGE
<br />NOTE:
<br />G I V I L RESOURCE5, LLG. 15 NOT RE5POM51 BLE FOR SAFETY, I M. DM, OR ABOUT THE PROJECT
<br />51TE, NOR FOR COMPLIANCE BY THE APPROPRIATE PARTY OF ANY RE641JLATIOM5
<br />THERETO.
<br />T4E5E MAP5 WERE PREPARED BY CAVIL RESOURCES, LLG. IM GOOPERAT I ON WITH 5W TV-0
<br />JOINT VEATfURE, LLG. 5W TKO JOINT VEKrrLRE, LLG. WILL KEEP THE DIV1510M OF MIMERAL5
<br />AMD &EOL06Y I MFORMED OF AMY C 44AM6E5 TO THE M I M I M6 OR 12EGLAMAT I OM PLAM5
<br />T14ROU644 AKWAL REPORTS AMD FILE TEGHMIGAL 2EV15I0MS ANV AMEMDMEAfT
<br />APPL I GAT I OM5 AS RY T14ROU644OUT THE LIFE OF THE MIME.
<br />kV-VAkIKJA ORTIZ DATE
<br />CIVIL 2ESOUR6E5, LLG.
<br />DIAMETER
<br />2-5 X'5 BALL WIDTH
<br />RECLAMATION NOTES
<br />5ET 514RU5 PLUMB.
<br />TOP OF ROOT 5ALL TO
<br />MATCH FINISH GRADE
<br />5" DEEP 51-4READED CEDAR MULCH
<br />INSIDE SAUCER FOR ALL SHRUBS
<br />PREPARED 5ACKFILL MIXTURE
<br />I. ONE PART COMP05T
<br />OR APPROVED EQUAL.
<br />2. TWO PART5 TOPSOIL.
<br />5. THREE PART5 NATIVE SOIL.
<br />4. MATERIAL5 TO 5E THOROU6HLY
<br />5LENDED.
<br />1. REFER TO THE RECLAMATION PLAN MAP (544EET 6) FOR A &EMERAL OVERVIEW OF THE
<br />REGLMATION PLAN. ALL PLAKr5 PROPOSED ON THE MINING PLAN SHALL REMAIN ON THE
<br />51TE AND ARE SHOWM ON THE RECLAMATION PLAN.
<br />2. ALL PPOP05ED LAND5CAPll SHALL 5E IRRIGATED WITH AN IRRIGATION SYSTEM. AREA5 PLANTED
<br />WITH THE SPECIFIED SEED MIX SHALL 5E IRRIGATED UNTIL E5TA51-15HED.
<br />5• ALL TREE5 --GALL HAVE 5' DIAMETER TREE WELLS. SHRUBS Al TREE5 TO 5E MULCHED WITH
<br />WOOD MULCH IM 4" MINIMUM DEEP 5ED5 TO FACILITATE MOWING UNTIL TREE5 AND SHRU55 ARE
<br />WELL E5TA5L.ISHED.
<br />4. LOCATION OF LANDSCAPE MATERIAL WILL 5E SUBJECT TO FIELD AD.AI5TMEKT TO ACCOMMODATE
<br />ANY FIXED IMPROVEMEMS AND 51TE CONDITIOM5.
<br />5. ALL IAAIDSCAPIN6 SHALL MEET THE UTILITY CLEARANCE REQUIREMENTS. TREE5 c,R T BE
<br />PLANTED WITHIN 5 OF A UTILITY LINE.
<br />6. THE I- AND5CAPE CONTRACTOR - -A4ALL CALL FOR ALL UTILITY LOCATES AND FIELD VERIFY THE
<br />LOCATION OF ALL UNDERGROUND UTILITIES.
<br />7. ALL LANDSCAPE SHALL BE INSTALLED CON6I5TENr WITH XERISCAPE 5TANDARD5 F012
<br />INSTALLATIOKL SOIL PREPARATION P.HD IRRI6ATION.
<br />8. ALL SEEDED LANDSCAPE AREA5 54ALL 5E RESEEDED A5 NEEDED UNTIL WELL ESTABLISHED.
<br />'3. TREES Al SHRUBS PLANTED WITHIN MULCHED 5ED5 WITHOUT EDGING SHALL 5E DRIP IRRIGATED.
<br />MULCHED BEDS SHALL NOT BE MAINTAINED ONCE TREE5 AND SHRUBS HAVE SEEN ESTABLISHED OR
<br />BEYOND 5 YEAR5. NATIVE GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHES)
<br />E-ED5 AFTER E5TA5LISHMEKT.
<br />10. ALL T2EE5 AND 5HRB5 SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HIGH WALL.
<br />11. TREE AND SHRUB SPEGIE5 SHALL BE PLANTED AT THE RELATIVE PPOP02TIOK5 1-15TED ON THE
<br />PLAKIT S64EDULE. COUNTS ARE PROVIDED FOR CALCULATION PURPOSES ONLY. W THE CA5E OF A
<br />DI5CREPANGY, THE C.OLW5 SHALL BE OVERRIDED 5y THE NUM5ER5 SHOWN ON THE PLAN. TREE5
<br />AND SHRUBS SHALL BE PLANTED IN CLUSTERS A5 SHOWN ON THE PLAID.
<br />12. ALL SUSTITUTIONS SHALL 5E APPROVED BY LAKD56APE ARCHITECT PRIOR TO PLANTING.
<br />PROPOSED SUBSTITUTIONS MUST 5E NATIVE AND SHALL ONLY 5E pROpo- TO
<br />ACLOMODATE AVAILASILTY OR 51TE CONDITIOJ5.
<br />15. 5EEDIN&5 OF SPECIFIED NATIVE GRASS MIX WILL TAKE PLACE ONCE FINAL GRADING Al
<br />REPL.ACEMEKr OF TOP501L HAVE SEEN COMPLETED FOR EACH PHA5E.
<br />14. FORDS SPECIES L15TED IN THE SEED SCHEDULE SHALL 5E ADDED TO 714E SEED MIX WHEN
<br />SEEDING SERM5 AND AREA5 ADJACENT TO THE TRAILS Al ADJAGEYTr HOME5.
<br />15.5EEDIH6 RATES SHALL SE DOU5LFD WHEN SEED MIX 15 HAND - BROADCAST.
<br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE 5EpTEM5ER AND MID -APRIL TO ASSURE ADEQUATE
<br />SITE CONDITIONS FOR 6ERMINATION. SEEDING SHALL 5E DONE IN UN- FROZFIJ SOIL.
<br />17. REVE6ETATED AREA5 WILL SE MULC.1-m WITH CLEAN, WEED-FREE STRAW OR NATIVE HAY. HAY
<br />SHALL 5E APPLIED AT A RATE OF 4,000 Lf55 /ACRE AND CRIMPED INTO THE SOIL.
<br />18. CRIMPING WILL BE DONE ALON6 THE CONTOUR.
<br />EXI5TIM6 TREE
<br />NO.
<br />EXI5TIMG STRUCTURES
<br />- -
<br />TOP OF 6RADE OF
<br />1
<br />RECLAIMED PONDS
<br />11/9/04
<br />GRAVEL ACCE55 ROAD
<br />2
<br />NAME CHANGE PER DMG
<br />2/20/0
<br />UPLAND
<br />'tl
<br />qmpqpqkw
<br />EVERGREEN TREE5
<br />U)
<br />DEGIDUOU5 TREE5
<br />�tgQ �O
<br />LARGE SHRUBS
<br />BO
<br />5MALL SH21-165
<br />G I V I L RESOURCE5, LLG. 15 NOT RE5POM51 BLE FOR SAFETY, I M. DM, OR ABOUT THE PROJECT
<br />51TE, NOR FOR COMPLIANCE BY THE APPROPRIATE PARTY OF ANY RE641JLATIOM5
<br />THERETO.
<br />T4E5E MAP5 WERE PREPARED BY CAVIL RESOURCES, LLG. IM GOOPERAT I ON WITH 5W TV-0
<br />JOINT VEATfURE, LLG. 5W TKO JOINT VEKrrLRE, LLG. WILL KEEP THE DIV1510M OF MIMERAL5
<br />AMD &EOL06Y I MFORMED OF AMY C 44AM6E5 TO THE M I M I M6 OR 12EGLAMAT I OM PLAM5
<br />T14ROU644 AKWAL REPORTS AMD FILE TEGHMIGAL 2EV15I0MS ANV AMEMDMEAfT
<br />APPL I GAT I OM5 AS RY T14ROU644OUT THE LIFE OF THE MIME.
<br />kV-VAkIKJA ORTIZ DATE
<br />CIVIL 2ESOUR6E5, LLG.
<br />DIAMETER
<br />2-5 X'5 BALL WIDTH
<br />RECLAMATION NOTES
<br />5ET 514RU5 PLUMB.
<br />TOP OF ROOT 5ALL TO
<br />MATCH FINISH GRADE
<br />5" DEEP 51-4READED CEDAR MULCH
<br />INSIDE SAUCER FOR ALL SHRUBS
<br />PREPARED 5ACKFILL MIXTURE
<br />I. ONE PART COMP05T
<br />OR APPROVED EQUAL.
<br />2. TWO PART5 TOPSOIL.
<br />5. THREE PART5 NATIVE SOIL.
<br />4. MATERIAL5 TO 5E THOROU6HLY
<br />5LENDED.
<br />1. REFER TO THE RECLAMATION PLAN MAP (544EET 6) FOR A &EMERAL OVERVIEW OF THE
<br />REGLMATION PLAN. ALL PLAKr5 PROPOSED ON THE MINING PLAN SHALL REMAIN ON THE
<br />51TE AND ARE SHOWM ON THE RECLAMATION PLAN.
<br />2. ALL PPOP05ED LAND5CAPll SHALL 5E IRRIGATED WITH AN IRRIGATION SYSTEM. AREA5 PLANTED
<br />WITH THE SPECIFIED SEED MIX SHALL 5E IRRIGATED UNTIL E5TA51-15HED.
<br />5• ALL TREE5 --GALL HAVE 5' DIAMETER TREE WELLS. SHRUBS Al TREE5 TO 5E MULCHED WITH
<br />WOOD MULCH IM 4" MINIMUM DEEP 5ED5 TO FACILITATE MOWING UNTIL TREE5 AND SHRU55 ARE
<br />WELL E5TA5L.ISHED.
<br />4. LOCATION OF LANDSCAPE MATERIAL WILL 5E SUBJECT TO FIELD AD.AI5TMEKT TO ACCOMMODATE
<br />ANY FIXED IMPROVEMEMS AND 51TE CONDITIOM5.
<br />5. ALL IAAIDSCAPIN6 SHALL MEET THE UTILITY CLEARANCE REQUIREMENTS. TREE5 c,R T BE
<br />PLANTED WITHIN 5 OF A UTILITY LINE.
<br />6. THE I- AND5CAPE CONTRACTOR - -A4ALL CALL FOR ALL UTILITY LOCATES AND FIELD VERIFY THE
<br />LOCATION OF ALL UNDERGROUND UTILITIES.
<br />7. ALL LANDSCAPE SHALL BE INSTALLED CON6I5TENr WITH XERISCAPE 5TANDARD5 F012
<br />INSTALLATIOKL SOIL PREPARATION P.HD IRRI6ATION.
<br />8. ALL SEEDED LANDSCAPE AREA5 54ALL 5E RESEEDED A5 NEEDED UNTIL WELL ESTABLISHED.
<br />'3. TREES Al SHRUBS PLANTED WITHIN MULCHED 5ED5 WITHOUT EDGING SHALL 5E DRIP IRRIGATED.
<br />MULCHED BEDS SHALL NOT BE MAINTAINED ONCE TREE5 AND SHRUBS HAVE SEEN ESTABLISHED OR
<br />BEYOND 5 YEAR5. NATIVE GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHES)
<br />E-ED5 AFTER E5TA5LISHMEKT.
<br />10. ALL T2EE5 AND 5HRB5 SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HIGH WALL.
<br />11. TREE AND SHRUB SPEGIE5 SHALL BE PLANTED AT THE RELATIVE PPOP02TIOK5 1-15TED ON THE
<br />PLAKIT S64EDULE. COUNTS ARE PROVIDED FOR CALCULATION PURPOSES ONLY. W THE CA5E OF A
<br />DI5CREPANGY, THE C.OLW5 SHALL BE OVERRIDED 5y THE NUM5ER5 SHOWN ON THE PLAN. TREE5
<br />AND SHRUBS SHALL BE PLANTED IN CLUSTERS A5 SHOWN ON THE PLAID.
<br />12. ALL SUSTITUTIONS SHALL 5E APPROVED BY LAKD56APE ARCHITECT PRIOR TO PLANTING.
<br />PROPOSED SUBSTITUTIONS MUST 5E NATIVE AND SHALL ONLY 5E pROpo- TO
<br />ACLOMODATE AVAILASILTY OR 51TE CONDITIOJ5.
<br />15. 5EEDIN&5 OF SPECIFIED NATIVE GRASS MIX WILL TAKE PLACE ONCE FINAL GRADING Al
<br />REPL.ACEMEKr OF TOP501L HAVE SEEN COMPLETED FOR EACH PHA5E.
<br />14. FORDS SPECIES L15TED IN THE SEED SCHEDULE SHALL 5E ADDED TO 714E SEED MIX WHEN
<br />SEEDING SERM5 AND AREA5 ADJACENT TO THE TRAILS Al ADJAGEYTr HOME5.
<br />15.5EEDIH6 RATES SHALL SE DOU5LFD WHEN SEED MIX 15 HAND - BROADCAST.
<br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE 5EpTEM5ER AND MID -APRIL TO ASSURE ADEQUATE
<br />SITE CONDITIONS FOR 6ERMINATION. SEEDING SHALL 5E DONE IN UN- FROZFIJ SOIL.
<br />17. REVE6ETATED AREA5 WILL SE MULC.1-m WITH CLEAN, WEED-FREE STRAW OR NATIVE HAY. HAY
<br />SHALL 5E APPLIED AT A RATE OF 4,000 Lf55 /ACRE AND CRIMPED INTO THE SOIL.
<br />18. CRIMPING WILL BE DONE ALON6 THE CONTOUR.
<br />Permit #: 6'0 Confidental ?: t�
<br />class: MV#
<br />From: L I L s'r, n� To: r�Le1C
<br />Doc. Name: 14AY, { r( :T -�
<br />Doc. Date (if no datd stamp): a ,, - c,. Section /Exh
<br />Inspection Date Specialist:
<br />LUPTON LAKES RESOURCE,
<br />FT. LUP70N SPECIAL USE PERMIT AND
<br />MLRB 112 RECLAMATION PERMIT M- 2004 -078
<br />RE-CLAMA71ON LANDSCAPE
<br />5W TKO JOINT VENTURE, LLC
<br />NO.
<br />REVISIONS
<br />DESCRIPTION
<br />DATE
<br />BY
<br />1
<br />REVISIONS PER SW TKO
<br />11/9/04
<br />OF
<br />2
<br />NAME CHANGE PER DMG
<br />2/20/0
<br />OF
<br />451 Oak Street, Suite 209
<br />CIVIL R E S 4*U R C E S, L LC P.O. Box 680 Frederick, CO 80530
<br />303 833 1416 (p) 303 833 2850 (f)
<br />DESIGNED BY: DO JOB NO. DWG:
<br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 4 -1 -05
<br />SCALE: AS NOTED SHEET: 7 OF 7
<br />CHECKED BY: DO
<br />3
<br />4
<br />PERMIT NO. CHANGE PER DMG
<br />FT LUPTON SPECIAL USE
<br />1/27/0
<br />3/24/05
<br />OF
<br />SR
<br />5
<br />DMG ADEQUACY REVIEW
<br />3/28/05
<br />KF
<br />6
<br />NAME CORRECTION
<br />4/8/05
<br />KF
<br />7
<br />ADEQUACY P N
<br />4 15 OS
<br />KF
<br />Permit #: 6'0 Confidental ?: t�
<br />class: MV#
<br />From: L I L s'r, n� To: r�Le1C
<br />Doc. Name: 14AY, { r( :T -�
<br />Doc. Date (if no datd stamp): a ,, - c,. Section /Exh
<br />Inspection Date Specialist:
<br />
|