Laserfiche WebLink
R <br />.nnrn'nrrnn,n. n ............................. ... ----'- <br />= r , <br />,�. I r` _. II ROBERT P. &JDEAN <br />� t <br />10' UNITED <br />POWER <br />EASEMENT <br />TIMOTHY D. & JERI E. <br />REISBECK <br />1, <br />PERIMETER FENCE <br />ALONG ALL PROPERTY <br />LINES (TYP.) <br />VILLANO <br />Ira smons■■monom■■somms■ <br />VILLANO BROTHERS <br />PROPERTIES, INC. <br />50' GASLINE ��- <br />EASEMENT GAS VdE_I <br />y - - 9SETBACK <br />75' SETBACK <br />0 <br />North <br />122' 0 50 100' 200' <br />SETBACK �4 <br />SCALE: I" =300' <br />North <br />0 500' 600' 1200' <br />SCALE: I"=600' <br />r :r <br />FLUSH WITH SOD AT E TO <br />• • • <br />2 � <br />BE KEPT " FROM TRUNK. <br />II . PL5/Acre <br />ALTERNATE CONIFER GUYING <br />r 1 <br />EQUALLY SPACED STEEL <br />E- <br />LUZ <br />-_ <br />&RAVE. 6UY TO MID -POINT OF TREE <br />6 <br />f FLAG WIRE WITH 1/2' DIAMETER <br />Western . <br />WHITE PVC, PIPE. <br />r' / r • / <br />_- <br />2. <br />5ET TREE IN PIT TO PROPER &BADE AND <br />_ <br />11711= <br />PLUMB. REMOVE REMAIMIN6 WIRE t <br />114-1 <br />., r <br />. •.> .. <br />REMOVE A5 MUCA A5 POSSIBLE £ <br />IQ <br />RA F-11 <br />�� <br />2/5 OF PIT, REMOVE TOP in OF BURLAP £ <br />OB <br />COMPLETE BACKFILL. UNDI5TUR15M <br />SOIL <br />PLASTIC FLA661H6 TAPE. C49IJIFER5 TO <br />I <br />HAVE 2 STAKES FOR TREE5 V Al <br />135 <br />LE55. 3 STAKES FOR TREE5 ABOVE 6'. <br />ar : <br />01111 UMVIN p, Ir, 10 W1111111M <br />- <br />I <br />5ET ROOT GALL_ OF ALL TREE5 4" <br />ABOVE GRADE IM IRRIGATED AREA5 AHD <br />AT GRADE TO T ABOVE GRADE IN <br />NON - IRRIGATED AREAS. MODIFY IF SOIL <br />CONDITIONS WARRANT £ PER CITY <br />DIRECTION. INSTALL A 5" HIGH BERM <br />AROUND TREES TO CREATE A WATERIN6 <br />BA51N. BERM 15 TEMPORARY IN IRRIGATED <br />AREA5. REMOVE BERM AFTER TWO <br />THOROUGH WATERIN&5 IN IRRIGATED <br />AREA5 £ MULGH.LEAVE BERM f MULCH IN <br />NON- IRRIGATED AREAS £ IN AREA5 OKLY <br />IR216ATED BY DRIP 5Y5TEM5 AFTER <br />DRYLAND GRASS ESTABLISHMENT PERIOD. <br />4" DEEP WOOD CHIP MULCH <br />FLUSH WITH SOD AT E TO <br />• • • <br />2 � <br />BE KEPT " FROM TRUNK. <br />II . PL5/Acre <br />ALTERNATE CONIFER GUYING <br />r 1 <br />EQUALLY SPACED STEEL <br />E- <br />WITH WHITE TOPS, . SET FLUSH WITH <br />5 <br />-_ <br />&RAVE. 6UY TO MID -POINT OF TREE <br />6 <br />f FLAG WIRE WITH 1/2' DIAMETER <br />Western . <br />WHITE PVC, PIPE. <br />© <br />REMOVE BOTTOM 1/5 OF WIRE BA51KET.- <br />2. <br />5ET TREE IN PIT TO PROPER &BADE AND <br />_ <br />11711= <br />PLUMB. REMOVE REMAIMIN6 WIRE t <br />114-1 <br />TWINE. IF PLASTIC OR TREATED BURLAP, <br />- -III- <br />REMOVE A5 MUCA A5 POSSIBLE £ <br />IQ <br />BACKFILL. IF REGULAR BURLAP, BACKFILL <br />ADEQUACY P N <br />2/5 OF PIT, REMOVE TOP in OF BURLAP £ <br />OB <br />COMPLETE BACKFILL. UNDI5TUR15M <br />SOIL <br />TREE PLANTING DETAIL <br />NOT TO SCALE <br />PRUNE DEAD OR DAMAGED <br />59ANC4-ES PRIOR TO PLANTING. <br />IF FORM I5 COMPROMISED BY <br />PRUJIN6. REPLACE SHRUB. <br />SPACE PLANT5 AND 5ET PLUMB <br />FOR 5F-5T EFFECT. <br />MOUND COMPACTED BACKFILL <br />UDDER ROOT5AL1-- OR <br />5ET OM UNDISTURBED SOIL. <br />REMOVE ALL GONTRINERS, BA51K-E <br />WIRE ETC. FROM ROOTBALL <br />.or 5GHEDULE <br />DO HOT PRUNE OR DAMA6E <br />• • • <br />CENTRAL LEADER. <br />II . PL5/Acre <br />WRAP TRUNK FROM &ROL&V <br />r 1 <br />LEVEL TO 5EC.OHD 5RANC.1-I <br />E- <br />WITH 4" KRAFT TYPE TREE <br />-_ <br />WRAP. SECURE ENDS WITH <br />6 <br />FLEXIBLE TAPE. <br />Western . <br />5TANDARD 6UYIN& SYSTEM: (OKL.Y <br />© <br />WHERE HEGE55ARY) MIN. 6' LON6 <br />2. <br />HEAVY DUTY T -BAR STEEL P05T <br />• 1 h <br />5TAKE5 WITH WHITE T-PO5T 6AP5 <br />x- <br />AHD WITH 17 &AU&E &ALVAMIZED <br />I. <br />STEEL WIRE 6UY5 SECURED TO TREE <br />r� <br />WITH CANVAS 5TRAP ABOVE FI125T <br />ADEQUACY P N <br />BRANCH. WIRE TO 5E TAUT BUT HOT <br />OB <br />OVER- TIGHT.FLA& WIRE WITH WHITE <br />r:rr 6raw <br />PLASTIC FLA661H6 TAPE. C49IJIFER5 TO <br />I <br />HAVE 2 STAKES FOR TREE5 V Al <br />135 <br />LE55. 3 STAKES FOR TREE5 ABOVE 6'. <br />DEGIDUOU5 TREE5 TO HAVE 2 5TAKE5 <br />,11 <br />FOR TREE5 2 -1/2" CAL. AHD LE-55. 5 <br />STAKE5 ABOVE 2-11T GAL. OIJE 5TAKE <br />ALWAYS IM DIRECTIOH OF PREVAILING <br />C-reen kleedlegass <br />WINDS. REMOVE 5TAKE5 £ 6UY5 <br />JIIII <br />AFTER I SEASON. <br />III <br />-I PREPARED BAC.KFILL MIXTURE: <br />1 =11 III <br />-il1 <br />-1 L ONE PART COMPOST OR <br />-1 1 1I <br />i = APPROVED EQUAL <br />111- III =Iii= iii- ill��lll= lll= ni =ni =ni = i�l =i7 <br />,� 2. TWO PARTS TOPSOIL. <br />5. THREE PART5 NATIVE SOIL. <br />DIAMETER 14x'5 <br />BALL WIDTH <br />4. MATERIALS TO 5E THOROUGHLY <br />BLENDED. <br />TREE PLANTING DETAIL <br />NOT TO SCALE <br />PRUNE DEAD OR DAMAGED <br />59ANC4-ES PRIOR TO PLANTING. <br />IF FORM I5 COMPROMISED BY <br />PRUJIN6. REPLACE SHRUB. <br />SPACE PLANT5 AND 5ET PLUMB <br />FOR 5F-5T EFFECT. <br />MOUND COMPACTED BACKFILL <br />UDDER ROOT5AL1-- OR <br />5ET OM UNDISTURBED SOIL. <br />REMOVE ALL GONTRINERS, BA51K-E <br />WIRE ETC. FROM ROOTBALL <br />.or 5GHEDULE <br />5dentific khrie <br />• • • <br />EXI5TIM6 WATER <br />II . PL5/Acre <br />', oF Mix <br />r 1 <br />.. <br />E- <br />- <br />-_ <br />POWER <br />6 <br />••. 1r <br />Western . <br />Arrba <br />© <br />_ <br />2. <br />•1 • i II. <br />• 1 h <br />-4__5 <br />x- <br />FEMGE <br />I. <br />4/8/05 <br />KF <br />7 <br />ADEQUACY P N <br />4 15 OS <br />OB <br />i1., xew •.u.:rr .. <br />r:rr 6raw <br />Va4wli kfte <br />I <br />15% <br />135 <br />,rr Vrdb <br />C-reen kleedlegass <br />Lodomn <br />.•: <br />/r cr pxr :r <br />• r Praneclover <br />go- <br />• r • 11 r • <br />• . . r . : <br />Sphaffalow cocchw <br />5carlet blobanallow <br />--IIIIIIIIIIIIIIII- <br />LEGEND: <br />- <br />PERMIT BOUNDARY <br />- <br />EXI5TIM6 WATER <br />- - O- - <br />EX 15T I M6 I' CONTOURS <br />1 <br />EXISTING POWER POLE <br />E- <br />EX15TIM6 OVERHEAD <br />2 <br />POWER <br />6 <br />EXISTING GA5 LINE <br />'tl <br />qmpqpqkw <br />6A5 MARKER <br />© <br />PETROLEUM WELL <br />U <br />6A5 /01 L EQU I PMEMT <br />III <br />TELEPHONE PEDESTAL <br />x- <br />FEMGE <br />NOTE: <br />G I V I L RESOURCE5, LLG. 15 NOT RE5POM51 BLE FOR SAFETY, I M. DM, OR ABOUT THE PROJECT <br />51TE, NOR FOR COMPLIANCE BY THE APPROPRIATE PARTY OF ANY RE641JLATIOM5 <br />THERETO. <br />T4E5E MAP5 WERE PREPARED BY CAVIL RESOURCES, LLG. IM GOOPERAT I ON WITH 5W TV-0 <br />JOINT VEATfURE, LLG. 5W TKO JOINT VEKrrLRE, LLG. WILL KEEP THE DIV1510M OF MIMERAL5 <br />AMD &EOL06Y I MFORMED OF AMY C 44AM6E5 TO THE M I M I M6 OR 12EGLAMAT I OM PLAM5 <br />T14ROU644 AKWAL REPORTS AMD FILE TEGHMIGAL 2EV15I0MS ANV AMEMDMEAfT <br />APPL I GAT I OM5 AS RY T14ROU644OUT THE LIFE OF THE MIME. <br />kV-VAkIKJA ORTIZ DATE <br />CIVIL 2ESOUR6E5, LLG. <br />DIAMETER <br />2-5 X'5 BALL WIDTH <br />RECLAMATION NOTES <br />5ET 514RU5 PLUMB. <br />TOP OF ROOT 5ALL TO <br />MATCH FINISH GRADE <br />5" DEEP 51-4READED CEDAR MULCH <br />INSIDE SAUCER FOR ALL SHRUBS <br />PREPARED 5ACKFILL MIXTURE <br />I. ONE PART COMP05T <br />OR APPROVED EQUAL. <br />2. TWO PART5 TOPSOIL. <br />5. THREE PART5 NATIVE SOIL. <br />4. MATERIAL5 TO 5E THOROU6HLY <br />5LENDED. <br />1. REFER TO THE RECLAMATION PLAN MAP (544EET 6) FOR A &EMERAL OVERVIEW OF THE <br />REGLMATION PLAN. ALL PLAKr5 PROPOSED ON THE MINING PLAN SHALL REMAIN ON THE <br />51TE AND ARE SHOWM ON THE RECLAMATION PLAN. <br />2. ALL PPOP05ED LAND5CAPll SHALL 5E IRRIGATED WITH AN IRRIGATION SYSTEM. AREA5 PLANTED <br />WITH THE SPECIFIED SEED MIX SHALL 5E IRRIGATED UNTIL E5TA51-15HED. <br />5• ALL TREE5 --GALL HAVE 5' DIAMETER TREE WELLS. SHRUBS Al TREE5 TO 5E MULCHED WITH <br />WOOD MULCH IM 4" MINIMUM DEEP 5ED5 TO FACILITATE MOWING UNTIL TREE5 AND SHRU55 ARE <br />WELL E5TA5L.ISHED. <br />4. LOCATION OF LANDSCAPE MATERIAL WILL 5E SUBJECT TO FIELD AD.AI5TMEKT TO ACCOMMODATE <br />ANY FIXED IMPROVEMEMS AND 51TE CONDITIOM5. <br />5. ALL IAAIDSCAPIN6 SHALL MEET THE UTILITY CLEARANCE REQUIREMENTS. TREE5 c,R T BE <br />PLANTED WITHIN 5 OF A UTILITY LINE. <br />6. THE I- AND5CAPE CONTRACTOR - -A4ALL CALL FOR ALL UTILITY LOCATES AND FIELD VERIFY THE <br />LOCATION OF ALL UNDERGROUND UTILITIES. <br />7. ALL LANDSCAPE SHALL BE INSTALLED CON6I5TENr WITH XERISCAPE 5TANDARD5 F012 <br />INSTALLATIOKL SOIL PREPARATION P.HD IRRI6ATION. <br />8. ALL SEEDED LANDSCAPE AREA5 54ALL 5E RESEEDED A5 NEEDED UNTIL WELL ESTABLISHED. <br />'3. TREES Al SHRUBS PLANTED WITHIN MULCHED 5ED5 WITHOUT EDGING SHALL 5E DRIP IRRIGATED. <br />MULCHED BEDS SHALL NOT BE MAINTAINED ONCE TREE5 AND SHRUBS HAVE SEEN ESTABLISHED OR <br />BEYOND 5 YEAR5. NATIVE GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHES) <br />E-ED5 AFTER E5TA5LISHMEKT. <br />10. ALL T2EE5 AND 5HRB5 SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HIGH WALL. <br />11. TREE AND SHRUB SPEGIE5 SHALL BE PLANTED AT THE RELATIVE PPOP02TIOK5 1-15TED ON THE <br />PLAKIT S64EDULE. COUNTS ARE PROVIDED FOR CALCULATION PURPOSES ONLY. W THE CA5E OF A <br />DI5CREPANGY, THE C.OLW5 SHALL BE OVERRIDED 5y THE NUM5ER5 SHOWN ON THE PLAN. TREE5 <br />AND SHRUBS SHALL BE PLANTED IN CLUSTERS A5 SHOWN ON THE PLAID. <br />12. ALL SUSTITUTIONS SHALL 5E APPROVED BY LAKD56APE ARCHITECT PRIOR TO PLANTING. <br />PROPOSED SUBSTITUTIONS MUST 5E NATIVE AND SHALL ONLY 5E pROpo- TO <br />ACLOMODATE AVAILASILTY OR 51TE CONDITIOJ5. <br />15. 5EEDIN&5 OF SPECIFIED NATIVE GRASS MIX WILL TAKE PLACE ONCE FINAL GRADING Al <br />REPL.ACEMEKr OF TOP501L HAVE SEEN COMPLETED FOR EACH PHA5E. <br />14. FORDS SPECIES L15TED IN THE SEED SCHEDULE SHALL 5E ADDED TO 714E SEED MIX WHEN <br />SEEDING SERM5 AND AREA5 ADJACENT TO THE TRAILS Al ADJAGEYTr HOME5. <br />15.5EEDIH6 RATES SHALL SE DOU5LFD WHEN SEED MIX 15 HAND - BROADCAST. <br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE 5EpTEM5ER AND MID -APRIL TO ASSURE ADEQUATE <br />SITE CONDITIONS FOR 6ERMINATION. SEEDING SHALL 5E DONE IN UN- FROZFIJ SOIL. <br />17. REVE6ETATED AREA5 WILL SE MULC.1-m WITH CLEAN, WEED-FREE STRAW OR NATIVE HAY. HAY <br />SHALL 5E APPLIED AT A RATE OF 4,000 Lf55 /ACRE AND CRIMPED INTO THE SOIL. <br />18. CRIMPING WILL BE DONE ALON6 THE CONTOUR. <br />EXI5TIM6 TREE <br />NO. <br />EXI5TIMG STRUCTURES <br />- - <br />TOP OF 6RADE OF <br />1 <br />RECLAIMED PONDS <br />11/9/04 <br />GRAVEL ACCE55 ROAD <br />2 <br />NAME CHANGE PER DMG <br />2/20/0 <br />UPLAND <br />'tl <br />qmpqpqkw <br />EVERGREEN TREE5 <br />U) <br />DEGIDUOU5 TREE5 <br />�tgQ �O <br />LARGE SHRUBS <br />BO <br />5MALL SH21-165 <br />G I V I L RESOURCE5, LLG. 15 NOT RE5POM51 BLE FOR SAFETY, I M. DM, OR ABOUT THE PROJECT <br />51TE, NOR FOR COMPLIANCE BY THE APPROPRIATE PARTY OF ANY RE641JLATIOM5 <br />THERETO. <br />T4E5E MAP5 WERE PREPARED BY CAVIL RESOURCES, LLG. IM GOOPERAT I ON WITH 5W TV-0 <br />JOINT VEATfURE, LLG. 5W TKO JOINT VEKrrLRE, LLG. WILL KEEP THE DIV1510M OF MIMERAL5 <br />AMD &EOL06Y I MFORMED OF AMY C 44AM6E5 TO THE M I M I M6 OR 12EGLAMAT I OM PLAM5 <br />T14ROU644 AKWAL REPORTS AMD FILE TEGHMIGAL 2EV15I0MS ANV AMEMDMEAfT <br />APPL I GAT I OM5 AS RY T14ROU644OUT THE LIFE OF THE MIME. <br />kV-VAkIKJA ORTIZ DATE <br />CIVIL 2ESOUR6E5, LLG. <br />DIAMETER <br />2-5 X'5 BALL WIDTH <br />RECLAMATION NOTES <br />5ET 514RU5 PLUMB. <br />TOP OF ROOT 5ALL TO <br />MATCH FINISH GRADE <br />5" DEEP 51-4READED CEDAR MULCH <br />INSIDE SAUCER FOR ALL SHRUBS <br />PREPARED 5ACKFILL MIXTURE <br />I. ONE PART COMP05T <br />OR APPROVED EQUAL. <br />2. TWO PART5 TOPSOIL. <br />5. THREE PART5 NATIVE SOIL. <br />4. MATERIAL5 TO 5E THOROU6HLY <br />5LENDED. <br />1. REFER TO THE RECLAMATION PLAN MAP (544EET 6) FOR A &EMERAL OVERVIEW OF THE <br />REGLMATION PLAN. ALL PLAKr5 PROPOSED ON THE MINING PLAN SHALL REMAIN ON THE <br />51TE AND ARE SHOWM ON THE RECLAMATION PLAN. <br />2. ALL PPOP05ED LAND5CAPll SHALL 5E IRRIGATED WITH AN IRRIGATION SYSTEM. AREA5 PLANTED <br />WITH THE SPECIFIED SEED MIX SHALL 5E IRRIGATED UNTIL E5TA51-15HED. <br />5• ALL TREE5 --GALL HAVE 5' DIAMETER TREE WELLS. SHRUBS Al TREE5 TO 5E MULCHED WITH <br />WOOD MULCH IM 4" MINIMUM DEEP 5ED5 TO FACILITATE MOWING UNTIL TREE5 AND SHRU55 ARE <br />WELL E5TA5L.ISHED. <br />4. LOCATION OF LANDSCAPE MATERIAL WILL 5E SUBJECT TO FIELD AD.AI5TMEKT TO ACCOMMODATE <br />ANY FIXED IMPROVEMEMS AND 51TE CONDITIOM5. <br />5. ALL IAAIDSCAPIN6 SHALL MEET THE UTILITY CLEARANCE REQUIREMENTS. TREE5 c,R T BE <br />PLANTED WITHIN 5 OF A UTILITY LINE. <br />6. THE I- AND5CAPE CONTRACTOR - -A4ALL CALL FOR ALL UTILITY LOCATES AND FIELD VERIFY THE <br />LOCATION OF ALL UNDERGROUND UTILITIES. <br />7. ALL LANDSCAPE SHALL BE INSTALLED CON6I5TENr WITH XERISCAPE 5TANDARD5 F012 <br />INSTALLATIOKL SOIL PREPARATION P.HD IRRI6ATION. <br />8. ALL SEEDED LANDSCAPE AREA5 54ALL 5E RESEEDED A5 NEEDED UNTIL WELL ESTABLISHED. <br />'3. TREES Al SHRUBS PLANTED WITHIN MULCHED 5ED5 WITHOUT EDGING SHALL 5E DRIP IRRIGATED. <br />MULCHED BEDS SHALL NOT BE MAINTAINED ONCE TREE5 AND SHRUBS HAVE SEEN ESTABLISHED OR <br />BEYOND 5 YEAR5. NATIVE GRASSES ARE TO FILL IN AROUND THEM AND REPLACE THE MULCHES) <br />E-ED5 AFTER E5TA5LISHMEKT. <br />10. ALL T2EE5 AND 5HRB5 SHALL BE PLANTED AT A MINIMUM OF 20' FROM THE MINING HIGH WALL. <br />11. TREE AND SHRUB SPEGIE5 SHALL BE PLANTED AT THE RELATIVE PPOP02TIOK5 1-15TED ON THE <br />PLAKIT S64EDULE. COUNTS ARE PROVIDED FOR CALCULATION PURPOSES ONLY. W THE CA5E OF A <br />DI5CREPANGY, THE C.OLW5 SHALL BE OVERRIDED 5y THE NUM5ER5 SHOWN ON THE PLAN. TREE5 <br />AND SHRUBS SHALL BE PLANTED IN CLUSTERS A5 SHOWN ON THE PLAID. <br />12. ALL SUSTITUTIONS SHALL 5E APPROVED BY LAKD56APE ARCHITECT PRIOR TO PLANTING. <br />PROPOSED SUBSTITUTIONS MUST 5E NATIVE AND SHALL ONLY 5E pROpo- TO <br />ACLOMODATE AVAILASILTY OR 51TE CONDITIOJ5. <br />15. 5EEDIN&5 OF SPECIFIED NATIVE GRASS MIX WILL TAKE PLACE ONCE FINAL GRADING Al <br />REPL.ACEMEKr OF TOP501L HAVE SEEN COMPLETED FOR EACH PHA5E. <br />14. FORDS SPECIES L15TED IN THE SEED SCHEDULE SHALL 5E ADDED TO 714E SEED MIX WHEN <br />SEEDING SERM5 AND AREA5 ADJACENT TO THE TRAILS Al ADJAGEYTr HOME5. <br />15.5EEDIH6 RATES SHALL SE DOU5LFD WHEN SEED MIX 15 HAND - BROADCAST. <br />16. SEEDING SHALL TAKE PLACE BETWEEN LATE 5EpTEM5ER AND MID -APRIL TO ASSURE ADEQUATE <br />SITE CONDITIONS FOR 6ERMINATION. SEEDING SHALL 5E DONE IN UN- FROZFIJ SOIL. <br />17. REVE6ETATED AREA5 WILL SE MULC.1-m WITH CLEAN, WEED-FREE STRAW OR NATIVE HAY. HAY <br />SHALL 5E APPLIED AT A RATE OF 4,000 Lf55 /ACRE AND CRIMPED INTO THE SOIL. <br />18. CRIMPING WILL BE DONE ALON6 THE CONTOUR. <br />Permit #: 6'0 Confidental ?: t� <br />class: MV# <br />From: L I L s'r, n� To: r�Le1C <br />Doc. Name: 14AY, { r( :T -� <br />Doc. Date (if no datd stamp): a ,, - c,. Section /Exh <br />Inspection Date Specialist: <br />LUPTON LAKES RESOURCE, <br />FT. LUP70N SPECIAL USE PERMIT AND <br />MLRB 112 RECLAMATION PERMIT M- 2004 -078 <br />RE-CLAMA71ON LANDSCAPE <br />5W TKO JOINT VENTURE, LLC <br />NO. <br />REVISIONS <br />DESCRIPTION <br />DATE <br />BY <br />1 <br />REVISIONS PER SW TKO <br />11/9/04 <br />OF <br />2 <br />NAME CHANGE PER DMG <br />2/20/0 <br />OF <br />451 Oak Street, Suite 209 <br />CIVIL R E S 4*U R C E S, L LC P.O. Box 680 Frederick, CO 80530 <br />303 833 1416 (p) 303 833 2850 (f) <br />DESIGNED BY: DO JOB NO. DWG: <br />DRAWN BY: ARR /SR DATE: SEPT. 2004 DMG- Revised for Adequacy Response 4 -1 -05 <br />SCALE: AS NOTED SHEET: 7 OF 7 <br />CHECKED BY: DO <br />3 <br />4 <br />PERMIT NO. CHANGE PER DMG <br />FT LUPTON SPECIAL USE <br />1/27/0 <br />3/24/05 <br />OF <br />SR <br />5 <br />DMG ADEQUACY REVIEW <br />3/28/05 <br />KF <br />6 <br />NAME CORRECTION <br />4/8/05 <br />KF <br />7 <br />ADEQUACY P N <br />4 15 OS <br />KF <br />Permit #: 6'0 Confidental ?: t� <br />class: MV# <br />From: L I L s'r, n� To: r�Le1C <br />Doc. Name: 14AY, { r( :T -� <br />Doc. Date (if no datd stamp): a ,, - c,. Section /Exh <br />Inspection Date Specialist: <br />