Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LARi?Y ~~~.1'C Date: /_iq-q~/ <br /> <br />Pond Number: ,p Date Last Inspection: /U -L S'~9,~ <br />Site Name: CR Df1 # 2 Quarter: F,2rf 9 `l <br /> <br />1. Design Depth Measured From Spillway Invert 9~0 <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Invert ~.1.? <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 7.9 <br /> <br />4. Water Level Measured From Spillway Invert ivo,v ~ <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes ~ No <br />6. Ri 11 s and Gullies Yes a' No <br />7. Vegetation Adequate ~ Yes No <br />8. Outlet Channel Erosion Yes k No <br />9. Animal Burrows Yes X No <br />10. Cracks _ Yes ~ No <br />11. Seepage Yes ~ No <br />_ <br />12. Spillway Clogged i Yes _~ No <br />13. Valves Operational ~ Yes _ No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED:T~,,,.i~ <br />SPI[tWAY INi/ERT~ _ _ <br />-- --~-- <br />---¢ --F ~~ 2 ~ z <br />W O~ N O S y q R 1 <br />3 ~ 0.~ o out h ~ ~~ A~ A <br />