Laserfiche WebLink
;~~ • IIIIIIIIIIIIIIIIIII • <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LAiz/1` ,E~erc~ke Date: /-/9-q¢ <br /> <br />Pond Number: / Date Last Inspection: /d-2S~ 9 3 <br /> <br />Site Name: tit tL - N~~ f~ Quarter: ~,ns~ 9 9 <br /> <br />1. Design Depth Measured From Spillway Invert ¢,2 S <br />2. Design Maximum Sediment Level Measured From Spillway Inv ert /.8 ~ <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 3. 2 <br /> <br />4. Water Level Measured From Spillway Invert .v u.ue <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes ~ No <br />6. Ri 11 s and Gullies Yes u No <br />7. Vegetation Adequate X Yes No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes ~ No <br />10. Cracks _ Yes /Y No <br />11. Seepage _ Yes ~' No <br />12. Spillway Clogged Yes ~ No <br />13. Valves Operational N!~ _ Yes No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED:~.~-E <br />_ _ SPI[[wAY SNVERT"7 <br />4 -~--- 1 <br />----- ~- ~~ z ~ z <br />~ ~ ~ <br />o / <br />W ~ 0 ~ W n n t <br />3 `„o ~ o 0 oe O h v R ~.~ti <br />